Stafford
3,213 delay minutes
The biggest share (32%) of the delay picked up at Stafford in the four weeks to 9 December 2023 came from faulty trains.
49% of these minutes were knock-on from something that happened elsewhere first. 90% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 97 | 3% | 8% | 3 a day, more than 3 of the other 4 years | 1 |
| Signals, points and power | 773 | 24% | 16% | 28 a day, more than 3 of the other 4 years | 3 |
| Weather and structures | 27 | <1% | 7% | 1 a day, the least in 5 years | - |
| Autumn | 23 | <1% | 7% | 1 a day, more than 2 of the other 4 years | - |
| External | 10 | <1% | 4% | 0 a day, the least in 5 years | - |
| Network management | 680 | 21% | 17% | 24 a day, the most in 5 years | 3 |
| The operators' causes | |||||
| Train faults | 1,038 | 32% | 16% | 37 a day, the most in 5 years | 11 |
| Traincrew | 317 | 10% | 11% | 11 a day, the most in 5 years | 5 |
| Stations | 77 | 2% | 3% | 3 a day, the most in 5 years | - |
| Operations | 76 | 2% | 5% | 3 a day, the most in 5 years | 1 |
| Operator, other | 96 | 3% | 7% | 3 a day, the least in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 686 |
| IA | Signal failure (including no fault found) | 353 |
| IH | Power Supply And Distribution System Failure | 205 |
| TG | Driver | 198 |
| JL | Safety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff) | 145 |
| J4 | Infrastructure Safety Issue Reported by Member of the Public - No Fault Found | 127 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 86 |
| JP | Failure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards | 84 |
| TH | (Senior) Conductor/Train Manager | 60 |
| Q1 | Takeback Pumps | 54 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IB | Points failure (including no fault found) | 8,847 |
| I1 | Overhead line/third rail defect | 7,857 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 5,101 |
| TG | Driver | 4,890 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 4,514 |
| JD | Structures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes) | 4,093 |
| J3 | Axle Counter Failure | 3,649 |
| XP | BRIDGE HIT | 2,886 |
| M8 | Technical failures above the Solebar | 2,559 |
| MD | Technical failures below the solebar | 2,541 |