0 delay minutes

No delay was picked up at Stockton in the four weeks to 9 December 2023.

100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideTrains cancelled
Network Rail's causes
Track--8%-
Signals, points and power--16%-
Weather and structures--7%-
Autumn--7%-
External--4%-
Network management--17%-
The operators' causes
Train faults--16%-
Traincrew--11%-
Stations--3%-
Operations--5%-
Operator, other--7%-

Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.

Period by period

Delay minutes a day, period by period. Gridlines every 2 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
Nothing logged.
Since 2018
CodeWhat Network Rail loggedMinutes
IKTelecom equipment failure (including no fault found)73
MCDiesel Loco failure, defect, attention61
QICautioning due to railhead leaf contamination57
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail41
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure27
XRCable vandalism or theft26
ICTrack circuit failure (including no fault found)26
TATrain-crew/loco/stock/unit diagram issues14
TITraincrew rostering problem11
TGDriver6