Southall
5,913 delay minutes
The biggest share (23%) of the delay picked up at Southall in the four weeks to 9 December 2023 came from track faults.
79% of these minutes were knock-on from something that happened elsewhere first. 76% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 1,367 | 23% | 8% | 49 a day, the most in 5 years | - |
| Signals, points and power | 767 | 13% | 16% | 27 a day, more than 2 of the other 4 years | - |
| Weather and structures | 144 | 2% | 7% | 5 a day, the most in 5 years | - |
| Autumn | 74 | 1% | 7% | 3 a day, more than 3 of the other 4 years | - |
| External | 54 | <1% | 4% | 2 a day, more than 2 of the other 4 years | - |
| Network management | 1,311 | 22% | 17% | 47 a day, the most in 5 years | - |
| The operators' causes | |||||
| Train faults | 982 | 17% | 16% | 35 a day, the most in 5 years | - |
| Traincrew | 574 | 10% | 11% | 21 a day, more than 3 of the other 4 years | - |
| Stations | 43 | <1% | 3% | 2 a day, more than 3 of the other 4 years | - |
| Operations | 356 | 6% | 5% | 13 a day, the most in 5 years | - |
| Operator, other | 242 | 4% | 7% | 9 a day, more than 3 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| OU | Delays not Investigated by Network Rail | 785 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 780 |
| M2 | Delay due to ATO / ETCS equipment | 559 |
| TG | Driver | 515 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 416 |
| TX | Delays incurred on non-Network Rail running lines or networks including London Underground (except fleet related delays) | 282 |
| I1 | Overhead line/third rail defect | 207 |
| IB | Points failure (including no fault found) | 161 |
| IT | Rough ride or bumps reported - cause not known or no fault found | 148 |
| IA | Signal failure (including no fault found) | 127 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IC | Track circuit failure (including no fault found) | 7,168 |
| IB | Points failure (including no fault found) | 7,066 |
| I1 | Overhead line/third rail defect | 6,115 |
| TG | Driver | 5,586 |
| M2 | Delay due to ATO / ETCS equipment | 5,037 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 4,929 |
| IA | Signal failure (including no fault found) | 4,884 |
| J3 | Axle Counter Failure | 4,258 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 4,019 |
| QM | Train schedule/STP Process including erroneous simplifiers | 2,908 |