Leaves on the Line

South Tottenham

STO Anglia route
CSV JSON

396 delay minutes

The biggest share (18%) of the delay picked up at South Tottenham in the four weeks to 9 December 2023 came from traincrew problems.

59% of these minutes were knock-on from something that happened elsewhere first. 97% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track51%8% 0 a day, more than 2 of the other 4 years-
Signals, points and power4311%16% 2 a day, more than 2 of the other 4 years-
Weather and structures--7% 0 a day, the least in 5 years-
Autumn133%7% 0 a day, more than 3 of the other 4 years-
External287%4% 1 a day, more than 2 of the other 4 years-
Network management5815%17% 2 a day, more than 3 of the other 4 years2
The operators' causes
Train faults5815%16% 2 a day, more than 1 of the other 4 years-
Traincrew7218%11% 3 a day, more than 1 of the other 4 years-
Stations359%3% 1 a day, more than 3 of the other 4 years-
Operations5414%5% 2 a day, the most in 5 years-
Operator, other318%7% 1 a day, more than 2 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
TGDriver52
TOTime lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility)46
MDTechnical failures below the solebar42
RBPassengers joining/alighting35
JXMiscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains)18
I9Fires starting on Network Rail Infrastructure14
IBPoints failure (including no fault found)13
FCFreight Train Driver error, SPAD, Wrong routing or Missed AWS/DSD [No change]12
IASignal failure (including no fault found)11
I1Overhead line/third rail defect10
Since 2018
CodeWhat Network Rail loggedMinutes
JDStructures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes)9,577
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.6,115
JSCondition of Track TSR outside the Timetable Planning Rules4,755
TGDriver4,618
RBPassengers joining/alighting4,013
IQTrackside sign blown down, fallen over, missing, defective, mis-placed2,061
MDTechnical failures below the solebar1,576
M8Technical failures above the Solebar1,266
M0Confirmed train cab based safety system fault (including GSMR)1,203
IBPoints failure (including no fault found)978