London St Pancras International
2,930 delay minutes
The biggest share (24%) of the delay picked up at London St Pancras International in the four weeks to 9 December 2023 came from traincrew problems.
80% of these minutes were knock-on from something that happened elsewhere first. 81% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 275 | 9% | 8% | 10 a day, the most in 5 years | 1 |
| Signals, points and power | 280 | 10% | 16% | 10 a day, more than 3 of the other 4 years | - |
| Weather and structures | 474 | 16% | 7% | 17 a day, the most in 5 years | 12 |
| Autumn | 17 | <1% | 7% | 1 a day, the most in 5 years | - |
| External | 38 | 1% | 4% | 1 a day, more than 2 of the other 4 years | - |
| Network management | 567 | 19% | 17% | 20 a day, the most in 5 years | 46 |
| The operators' causes | |||||
| Train faults | 464 | 16% | 16% | 17 a day, more than 3 of the other 4 years | 14 |
| Traincrew | 712 | 24% | 11% | 25 a day, the most in 5 years | 12 |
| Stations | 64 | 2% | 3% | 2 a day, more than 2 of the other 4 years | - |
| Operations | 2 | <1% | 5% | 0 a day, more than 2 of the other 4 years | - |
| Operator, other | 38 | 1% | 7% | 1 a day, more than 3 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 472 |
| JK | Flooding not due to exceptional weather | 372 |
| I5 | Possession over-run from planned work | 254 |
| M8 | Technical failures above the Solebar | 248 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 201 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 91 |
| M7 | Door and Door system faults | 90 |
| TI | Traincrew rostering problem | 85 |
| T3 | Waiting connections from other transport modes | 80 |
| TH | (Senior) Conductor/Train Manager | 75 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 8,241 |
| M8 | Technical failures above the Solebar | 7,568 |
| MD | Technical failures below the solebar | 4,222 |
| IB | Points failure (including no fault found) | 3,697 |
| X2 | Severe flooding beyond that which could be mitigated on Network Rail infrastructure | 3,430 |
| M7 | Door and Door system faults | 2,862 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 2,834 |
| IH | Power Supply And Distribution System Failure | 2,505 |
| XR | Cable vandalism or theft | 2,384 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 1,941 |