2,930 delay minutes

The biggest share (24%) of the delay picked up at London St Pancras International in the four weeks to 9 December 2023 came from traincrew problems.

80% of these minutes were knock-on from something that happened elsewhere first. 81% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track2759%8% 10 a day, the most in 5 years1
Signals, points and power28010%16% 10 a day, more than 3 of the other 4 years-
Weather and structures47416%7% 17 a day, the most in 5 years12
Autumn17<1%7% 1 a day, the most in 5 years-
External381%4% 1 a day, more than 2 of the other 4 years-
Network management56719%17% 20 a day, the most in 5 years46
The operators' causes
Train faults46416%16% 17 a day, more than 3 of the other 4 years14
Traincrew71224%11% 25 a day, the most in 5 years12
Stations642%3% 2 a day, more than 2 of the other 4 years-
Operations2<1%5% 0 a day, more than 2 of the other 4 years-
Operator, other381%7% 1 a day, more than 3 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 50 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
TGDriver472
JKFlooding not due to exceptional weather372
I5Possession over-run from planned work254
M8Technical failures above the Solebar248
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.201
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail91
M7Door and Door system faults90
TITraincrew rostering problem85
T3Waiting connections from other transport modes80
TH(Senior) Conductor/Train Manager75
Since 2018
CodeWhat Network Rail loggedMinutes
TGDriver8,241
M8Technical failures above the Solebar7,568
MDTechnical failures below the solebar4,222
IBPoints failure (including no fault found)3,697
X2Severe flooding beyond that which could be mitigated on Network Rail infrastructure3,430
M7Door and Door system faults2,862
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.2,834
IHPower Supply And Distribution System Failure2,505
XRCable vandalism or theft2,384
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail1,941