Saltash
290 delay minutes
The biggest share (39%) of the delay picked up at Saltash in the four weeks to 9 December 2023 came from track faults.
51% of these minutes were knock-on from something that happened elsewhere first. 98% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 113 | 39% | 8% | 4 a day, the most in 5 years | - |
| Signals, points and power | 16 | 6% | 16% | 1 a day, more than 1 of the other 4 years | - |
| Weather and structures | 12 | 4% | 7% | 0 a day, more than 2 of the other 4 years | - |
| Autumn | 10 | 3% | 7% | 0 a day, the least in 5 years | - |
| External | 10 | 3% | 4% | 0 a day, the most in 5 years | - |
| Network management | 28 | 10% | 17% | 1 a day, more than 3 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 66 | 23% | 16% | 2 a day, the most in 5 years | - |
| Traincrew | 13 | 4% | 11% | 0 a day, more than 2 of the other 4 years | - |
| Stations | 9 | 3% | 3% | 0 a day, more than 3 of the other 4 years | - |
| Operations | 1 | <1% | 5% | 0 a day, more than 3 of the other 4 years | - |
| Operator, other | 12 | 4% | 7% | 0 a day, more than 1 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 95 |
| M0 | Confirmed train cab based safety system fault (including GSMR) | 63 |
| OU | Delays not Investigated by Network Rail | 17 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 14 |
| TG | Driver | 13 |
| IC | Track circuit failure (including no fault found) | 12 |
| XK | National Grid Power Failure - local area also affected (inc outage, surges, blips where working standby generator/UPS installed) | 7 |
| Q3 | NZ Pumps T | 6 |
| RB | Passengers joining/alighting | 6 |
| TT | Leaf fall Neutral | 6 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IC | Track circuit failure (including no fault found) | 1,394 |
| J3 | Axle Counter Failure | 1,157 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 843 |
| TG | Driver | 707 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 669 |
| IB | Points failure (including no fault found) | 648 |
| MD | Technical failures below the solebar | 624 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 603 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 449 |
| IA | Signal failure (including no fault found) | 435 |