4,073 delay minutes
The biggest share (26%) of the delay picked up at Surbiton in the four weeks to 9 December 2023 came from how the network was run.
66% of these minutes were knock-on from something that happened elsewhere first. 99% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 285 | 7% | 8% | 10 a day, more than 2 of the other 4 years | 1 |
| Signals, points and power | 789 | 19% | 16% | 28 a day, more than 3 of the other 4 years | 3 |
| Weather and structures | 52 | 1% | 7% | 2 a day, more than 3 of the other 4 years | - |
| Autumn | 624 | 15% | 7% | 22 a day, more than 3 of the other 4 years | - |
| External | 28 | <1% | 4% | 1 a day, more than 1 of the other 4 years | - |
| Network management | 1,057 | 26% | 17% | 38 a day, the most in 5 years | 1 |
| The operators' causes | |||||
| Train faults | 241 | 6% | 16% | 9 a day, more than 2 of the other 4 years | 2 |
| Traincrew | 195 | 5% | 11% | 7 a day, more than 3 of the other 4 years | 2 |
| Stations | 105 | 3% | 3% | 4 a day, more than 1 of the other 4 years | - |
| Operations | 43 | 1% | 5% | 2 a day, the most in 5 years | - |
| Operator, other | 654 | 16% | 7% | 23 a day, more than 2 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| Q3 | NZ Pumps T | 536 |
| TT | Leaf fall Neutral | 536 |
| IB | Points failure (including no fault found) | 524 |
| QB | Planned engineering work - diversion/SLW not timetabled (outside the Timetable Planning Rules) | 241 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 219 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 192 |
| I5 | Possession over-run from planned work | 184 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 113 |
| TG | Driver | 100 |
| IC | Track circuit failure (including no fault found) | 97 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 12,430 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 12,336 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 8,412 |
| IB | Points failure (including no fault found) | 8,377 |
| IC | Track circuit failure (including no fault found) | 8,203 |
| XP | BRIDGE HIT | 5,504 |
| TG | Driver | 5,445 |
| MD | Technical failures below the solebar | 5,237 |
| TT | Leaf fall Neutral | 4,593 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 4,453 |