Severn Beach
528 delay minutes
The biggest share (27%) of the delay picked up at Severn Beach in the four weeks to 9 December 2023 came from signal, points and power faults.
91% of these minutes were knock-on from something that happened elsewhere first. 95% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 29 | 5% | 8% | 1 a day, more than 3 of the other 4 years | - |
| Signals, points and power | 141 | 27% | 16% | 5 a day, the most in 5 years | - |
| Weather and structures | 12 | 2% | 7% | 0 a day, more than 2 of the other 4 years | 5 |
| Autumn | 45 | 8% | 7% | 2 a day, more than 2 of the other 4 years | - |
| External | 113 | 21% | 4% | 4 a day, the most in 5 years | 1 |
| Network management | 34 | 6% | 17% | 1 a day, more than 1 of the other 4 years | 1 |
| The operators' causes | |||||
| Train faults | 40 | 8% | 16% | 1 a day, more than 1 of the other 4 years | 4 |
| Traincrew | 103 | 20% | 11% | 4 a day, the most in 5 years | 14 |
| Stations | - | - | 3% | 0 a day, the least in 5 years | - |
| Operations | - | - | 5% | 0 a day, the least in 5 years | - |
| Operator, other | 12 | 2% | 7% | 0 a day, more than 1 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| XO | External trees, building or structures encroaching or falling onto network infrastructure (not weather or vandalism) | 113 |
| TG | Driver | 103 |
| I2 | AC/DC trip (including no fault or cause found) | 73 |
| IB | Points failure (including no fault found) | 38 |
| I4 | OHLE/third rail power supply failure or reduction | 30 |
| QI | Cautioning due to railhead leaf contamination | 30 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 26 |
| M8 | Technical failures above the Solebar | 19 |
| OU | Delays not Investigated by Network Rail | 15 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 13 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| ZU | No Cause Identified After investigation by both Parties | 1,063 |
| MD | Technical failures below the solebar | 1,021 |
| TG | Driver | 668 |
| M7 | Door and Door system faults | 622 |
| RB | Passengers joining/alighting | 619 |
| M8 | Technical failures above the Solebar | 459 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 418 |
| MU | Depot operating problem | 365 |
| Q1 | Takeback Pumps | 353 |
| IB | Points failure (including no fault found) | 348 |