368 delay minutes

Most of the delay picked up at Seven Sisters in the four weeks to 9 December 2023 came from how the network was run.

14% of these minutes were knock-on from something that happened elsewhere first. 99% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track--8% 0 a day, the least in 5 years-
Signals, points and power72%16% 0 a day, more than 2 of the other 4 years-
Weather and structures--7% 0 a day, the least in 5 years-
Autumn--7% 0 a day, the least in 5 years-
External4713%4% 2 a day, the most in 5 years-
Network management23464%17% 8 a day, the most in 5 years-
The operators' causes
Train faults51%16% 0 a day, the least in 5 years-
Traincrew3<1%11% 0 a day, more than 1 of the other 4 years-
Stations3710%3% 1 a day, more than 2 of the other 4 years-
Operations144%5% 1 a day, more than 3 of the other 4 years-
Operator, other216%7% 1 a day, more than 3 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 50 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
I8Animal Strike or Incursion within the control of Network Rail228
XPBRIDGE HIT47
R7Station delays as a result of overcrowding due to planned events (e.g. sports fixtures, concerts)18
TOTime lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility)14
RBPassengers joining/alighting13
VHPassenger Communication cord, door egress or emergency train alarm operated12
ICTrack circuit failure (including no fault found)7
JXMiscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains)6
RCre-booked assistance for a person with reduced mobility joining/alighting,6
VZOther passenger or external causes the responsibility of TOC5
Since 2018
CodeWhat Network Rail loggedMinutes
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.17,867
JSCondition of Track TSR outside the Timetable Planning Rules6,321
JATSR speed restrictions for track work outside of the Timetable Planning Rules2,484
RBPassengers joining/alighting1,652
TGDriver1,135
MDTechnical failures below the solebar925
IRBroken/cracked/twisted/buckled/flawed rail890
R7Station delays as a result of overcrowding due to planned events (e.g. sports fixtures, concerts)769
IBPoints failure (including no fault found)749
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure747