Swindon
2,426 delay minutes
The biggest share (23%) of the delay picked up at Swindon in the four weeks to 9 December 2023 came from track faults.
53% of these minutes were knock-on from something that happened elsewhere first. 95% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 564 | 23% | 8% | 20 a day, the most in 5 years | 8 |
| Signals, points and power | 405 | 17% | 16% | 14 a day, the most in 5 years | 3 |
| Weather and structures | 183 | 8% | 7% | 7 a day, the most in 5 years | 2 |
| Autumn | 7 | <1% | 7% | 0 a day, more than 1 of the other 4 years | - |
| External | 35 | 1% | 4% | 1 a day, the least in 5 years | - |
| Network management | 434 | 18% | 17% | 15 a day, the most in 5 years | 17 |
| The operators' causes | |||||
| Train faults | 288 | 12% | 16% | 10 a day, more than 1 of the other 4 years | 4 |
| Traincrew | 372 | 15% | 11% | 13 a day, the most in 5 years | 32 |
| Stations | 48 | 2% | 3% | 2 a day, more than 3 of the other 4 years | - |
| Operations | 39 | 2% | 5% | 1 a day, more than 2 of the other 4 years | - |
| Operator, other | 53 | 2% | 7% | 2 a day, more than 1 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 484 |
| IB | Points failure (including no fault found) | 292 |
| TG | Driver | 271 |
| X2 | Severe flooding beyond that which could be mitigated on Network Rail infrastructure | 183 |
| OU | Delays not Investigated by Network Rail | 157 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 74 |
| TH | (Senior) Conductor/Train Manager | 60 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 59 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 52 |
| M8 | Technical failures above the Solebar | 50 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 5,113 |
| IB | Points failure (including no fault found) | 4,533 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 4,337 |
| MD | Technical failures below the solebar | 4,243 |
| X2 | Severe flooding beyond that which could be mitigated on Network Rail infrastructure | 3,948 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 3,795 |
| J3 | Axle Counter Failure | 3,715 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 2,720 |
| M8 | Technical failures above the Solebar | 2,587 |
| IC | Track circuit failure (including no fault found) | 2,505 |