Swinton (South Yorks)
920 delay minutes
The biggest share (17%) of the delay picked up at Swinton (South Yorks) in the four weeks to 9 December 2023 came from how the network was run.
61% of these minutes were knock-on from something that happened elsewhere first. 91% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 45 | 5% | 8% | 2 a day, more than 1 of the other 4 years | - |
| Signals, points and power | 96 | 10% | 16% | 3 a day, more than 1 of the other 4 years | - |
| Weather and structures | 73 | 8% | 7% | 3 a day, more than 2 of the other 4 years | - |
| Autumn | 80 | 9% | 7% | 3 a day, the most in 5 years | - |
| External | 88 | 10% | 4% | 3 a day, the most in 5 years | - |
| Network management | 155 | 17% | 17% | 6 a day, more than 1 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 116 | 13% | 16% | 4 a day, more than 1 of the other 4 years | - |
| Traincrew | 57 | 6% | 11% | 2 a day, more than 2 of the other 4 years | - |
| Stations | 57 | 6% | 3% | 2 a day, more than 1 of the other 4 years | - |
| Operations | 60 | 7% | 5% | 2 a day, more than 3 of the other 4 years | - |
| Operator, other | 94 | 10% | 7% | 3 a day, more than 2 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| XP | BRIDGE HIT | 67 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 54 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 50 |
| OU | Delays not Investigated by Network Rail | 49 |
| QJ | Special working for leaf-fall track circuit operation | 49 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 36 |
| TG | Driver | 36 |
| RC | re-booked assistance for a person with reduced mobility joining/alighting, | 35 |
| IB | Points failure (including no fault found) | 34 |
| FW | Late start/yard overtime not explained by Operator | 32 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 2,258 |
| JS | Condition of Track TSR outside the Timetable Planning Rules | 1,811 |
| MD | Technical failures below the solebar | 1,740 |
| RC | re-booked assistance for a person with reduced mobility joining/alighting, | 1,662 |
| IB | Points failure (including no fault found) | 1,547 |
| IC | Track circuit failure (including no fault found) | 1,479 |
| X2 | Severe flooding beyond that which could be mitigated on Network Rail infrastructure | 1,380 |
| XP | BRIDGE HIT | 1,372 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 1,224 |
| XB | Vandalism or theft (including the placing of objects on the line) | 1,187 |