Leaves on the Line

Swinton (South Yorks)

SWN North & East route
CSV JSON

920 delay minutes

The biggest share (17%) of the delay picked up at Swinton (South Yorks) in the four weeks to 9 December 2023 came from how the network was run.

61% of these minutes were knock-on from something that happened elsewhere first. 91% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track455%8% 2 a day, more than 1 of the other 4 years-
Signals, points and power9610%16% 3 a day, more than 1 of the other 4 years-
Weather and structures738%7% 3 a day, more than 2 of the other 4 years-
Autumn809%7% 3 a day, the most in 5 years-
External8810%4% 3 a day, the most in 5 years-
Network management15517%17% 6 a day, more than 1 of the other 4 years-
The operators' causes
Train faults11613%16% 4 a day, more than 1 of the other 4 years-
Traincrew576%11% 2 a day, more than 2 of the other 4 years-
Stations576%3% 2 a day, more than 1 of the other 4 years-
Operations607%5% 2 a day, more than 3 of the other 4 years-
Operator, other9410%7% 3 a day, more than 2 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
XPBRIDGE HIT67
MPRail / wheel interface, adhesion problems (including ice on the running rail)54
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail50
OUDelays not Investigated by Network Rail49
QJSpecial working for leaf-fall track circuit operation49
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.36
TGDriver36
RCre-booked assistance for a person with reduced mobility joining/alighting,35
IBPoints failure (including no fault found)34
FWLate start/yard overtime not explained by Operator32
Since 2018
CodeWhat Network Rail loggedMinutes
TGDriver2,258
JSCondition of Track TSR outside the Timetable Planning Rules1,811
MDTechnical failures below the solebar1,740
RCre-booked assistance for a person with reduced mobility joining/alighting,1,662
IBPoints failure (including no fault found)1,547
ICTrack circuit failure (including no fault found)1,479
X2Severe flooding beyond that which could be mitigated on Network Rail infrastructure1,380
XPBRIDGE HIT1,372
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.1,224
XBVandalism or theft (including the placing of objects on the line)1,187