Stalybridge
2,831 delay minutes
The biggest share (18%) of the delay picked up at Stalybridge in the four weeks to 9 December 2023 came from how the network was run.
76% of these minutes were knock-on from something that happened elsewhere first. 92% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 230 | 8% | 8% | 8 a day, more than 2 of the other 4 years | 4 |
| Signals, points and power | 364 | 13% | 16% | 13 a day, more than 2 of the other 4 years | - |
| Weather and structures | 353 | 12% | 7% | 13 a day, the most in 5 years | 1 |
| Autumn | 214 | 8% | 7% | 8 a day, more than 3 of the other 4 years | - |
| External | 99 | 3% | 4% | 4 a day, more than 3 of the other 4 years | 1 |
| Network management | 503 | 18% | 17% | 18 a day, more than 2 of the other 4 years | 4 |
| The operators' causes | |||||
| Train faults | 345 | 12% | 16% | 12 a day, more than 2 of the other 4 years | - |
| Traincrew | 388 | 14% | 11% | 14 a day, more than 3 of the other 4 years | 28 |
| Stations | 73 | 3% | 3% | 3 a day, more than 2 of the other 4 years | - |
| Operations | 131 | 5% | 5% | 5 a day, more than 2 of the other 4 years | 1 |
| Operator, other | 133 | 5% | 7% | 5 a day, more than 2 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 255 |
| IC | Track circuit failure (including no fault found) | 208 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 128 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 123 |
| TH | (Senior) Conductor/Train Manager | 122 |
| MD | Technical failures below the solebar | 118 |
| OU | Delays not Investigated by Network Rail | 106 |
| QJ | Special working for leaf-fall track circuit operation | 105 |
| I5 | Possession over-run from planned work | 91 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 90 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 11,609 |
| MD | Technical failures below the solebar | 6,968 |
| IC | Track circuit failure (including no fault found) | 4,262 |
| M8 | Technical failures above the Solebar | 3,932 |
| TH | (Senior) Conductor/Train Manager | 3,931 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 3,836 |
| M7 | Door and Door system faults | 3,522 |
| IB | Points failure (including no fault found) | 3,354 |
| MU | Depot operating problem | 3,108 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 2,958 |