Leaves on the Line

Stalybridge

SYB North West route
CSV JSON

2,831 delay minutes

The biggest share (18%) of the delay picked up at Stalybridge in the four weeks to 9 December 2023 came from how the network was run.

76% of these minutes were knock-on from something that happened elsewhere first. 92% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track2308%8% 8 a day, more than 2 of the other 4 years4
Signals, points and power36413%16% 13 a day, more than 2 of the other 4 years-
Weather and structures35312%7% 13 a day, the most in 5 years1
Autumn2148%7% 8 a day, more than 3 of the other 4 years-
External993%4% 4 a day, more than 3 of the other 4 years1
Network management50318%17% 18 a day, more than 2 of the other 4 years4
The operators' causes
Train faults34512%16% 12 a day, more than 2 of the other 4 years-
Traincrew38814%11% 14 a day, more than 3 of the other 4 years28
Stations733%3% 3 a day, more than 2 of the other 4 years-
Operations1315%5% 5 a day, more than 2 of the other 4 years1
Operator, other1335%7% 5 a day, more than 2 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 100 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
TGDriver255
ICTrack circuit failure (including no fault found)208
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail128
IRBroken/cracked/twisted/buckled/flawed rail123
TH(Senior) Conductor/Train Manager122
MDTechnical failures below the solebar118
OUDelays not Investigated by Network Rail106
QJSpecial working for leaf-fall track circuit operation105
I5Possession over-run from planned work91
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.90
Since 2018
CodeWhat Network Rail loggedMinutes
TGDriver11,609
MDTechnical failures below the solebar6,968
ICTrack circuit failure (including no fault found)4,262
M8Technical failures above the Solebar3,932
TH(Senior) Conductor/Train Manager3,931
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)3,836
M7Door and Door system faults3,522
IBPoints failure (including no fault found)3,354
MUDepot operating problem3,108
MSPlanned underpowered or shortformed service and or vehicle, incl. exam set swaps2,958