Leaves on the Line

Tame Bridge Parkway

TAB Central route
CSV JSON

6 delay minutes

Most of the delay picked up at Tame Bridge Parkway in the four weeks to 9 December 2023 came from signal, points and power faults.

0% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideTrains cancelled
Network Rail's causes
Track--8%-
Signals, points and power6100%16%1
Weather and structures--7%-
Autumn--7%-
External--4%-
Network management--17%-
The operators' causes
Train faults--16%-
Traincrew--11%-
Stations--3%-
Operations--5%-
Operator, other--7%-

Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.

Period by period

Delay minutes a day, period by period. Gridlines every 2 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
IBPoints failure (including no fault found)6
Since 2018
CodeWhat Network Rail loggedMinutes
OCSignaller including mis-routing (not ERTM /ETCS related)164
MDTechnical failures below the solebar118
IBPoints failure (including no fault found)91
TGDriver69
M7Door and Door system faults57
JPFailure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards54
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.37
AKSafety Ins and mishaps(derailments, fire, chemical spill) in off n/w freight yard or terminal (inc private sdgs affecting FOC32
X2Severe flooding beyond that which could be mitigated on Network Rail infrastructure29
XKNational Grid Power Failure - local area also affected (inc outage, surges, blips where working standby generator/UPS installed)29