Leaves on the Line

Tunbridge Wells

TBW Kent route
CSV JSON

1,312 delay minutes

The biggest share (23%) of the delay picked up at Tunbridge Wells in the four weeks to 9 December 2023 came from other operator causes.

83% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track242%8% 1 a day, more than 1 of the other 4 years-
Signals, points and power826%16% 3 a day, more than 1 of the other 4 years-
Weather and structures1058%7% 4 a day, more than 3 of the other 4 years-
Autumn19215%7% 7 a day, the most in 5 years1
External322%4% 1 a day, more than 1 of the other 4 years-
Network management27321%17% 10 a day, more than 3 of the other 4 years32
The operators' causes
Train faults15011%16% 5 a day, more than 2 of the other 4 years3
Traincrew806%11% 3 a day, more than 3 of the other 4 years2
Stations333%3% 1 a day, more than 2 of the other 4 years-
Operations403%5% 1 a day, more than 2 of the other 4 years-
Operator, other30323%7% 11 a day, more than 3 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
Q3NZ Pumps T172
TTLeaf fall Neutral172
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)118
OGIce on conductor rail/OHLE105
VHPassenger Communication cord, door egress or emergency train alarm operated88
TGDriver60
M7Door and Door system faults38
MDTechnical failures below the solebar35
OMTechnical failure associated with a Railhead conditioning train34
VBVandalism or theft33
Since 2018
CodeWhat Network Rail loggedMinutes
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)5,065
TGDriver3,465
ICTrack circuit failure (including no fault found)2,787
JPFailure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards2,333
IBPoints failure (including no fault found)2,243
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.1,810
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure1,696
OCSignaller including mis-routing (not ERTM /ETCS related)1,632
MNBrake and brake systems faults; including wheel flats where no other cause had been identified1,431
IRBroken/cracked/twisted/buckled/flawed rail1,372