Tunbridge Wells
1,312 delay minutes
The biggest share (23%) of the delay picked up at Tunbridge Wells in the four weeks to 9 December 2023 came from other operator causes.
83% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 24 | 2% | 8% | 1 a day, more than 1 of the other 4 years | - |
| Signals, points and power | 82 | 6% | 16% | 3 a day, more than 1 of the other 4 years | - |
| Weather and structures | 105 | 8% | 7% | 4 a day, more than 3 of the other 4 years | - |
| Autumn | 192 | 15% | 7% | 7 a day, the most in 5 years | 1 |
| External | 32 | 2% | 4% | 1 a day, more than 1 of the other 4 years | - |
| Network management | 273 | 21% | 17% | 10 a day, more than 3 of the other 4 years | 32 |
| The operators' causes | |||||
| Train faults | 150 | 11% | 16% | 5 a day, more than 2 of the other 4 years | 3 |
| Traincrew | 80 | 6% | 11% | 3 a day, more than 3 of the other 4 years | 2 |
| Stations | 33 | 3% | 3% | 1 a day, more than 2 of the other 4 years | - |
| Operations | 40 | 3% | 5% | 1 a day, more than 2 of the other 4 years | - |
| Operator, other | 303 | 23% | 7% | 11 a day, more than 3 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| Q3 | NZ Pumps T | 172 |
| TT | Leaf fall Neutral | 172 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 118 |
| OG | Ice on conductor rail/OHLE | 105 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 88 |
| TG | Driver | 60 |
| M7 | Door and Door system faults | 38 |
| MD | Technical failures below the solebar | 35 |
| OM | Technical failure associated with a Railhead conditioning train | 34 |
| VB | Vandalism or theft | 33 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 5,065 |
| TG | Driver | 3,465 |
| IC | Track circuit failure (including no fault found) | 2,787 |
| JP | Failure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards | 2,333 |
| IB | Points failure (including no fault found) | 2,243 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 1,810 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 1,696 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 1,632 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 1,431 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 1,372 |