Teddington
169 delay minutes
The biggest share (35%) of the delay picked up at Teddington in the four weeks to 9 December 2023 came from how the network was run.
52% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 34 | 20% | 8% | 1 a day, the most in 5 years | - |
| Signals, points and power | 7 | 4% | 16% | 0 a day, more than 2 of the other 4 years | - |
| Weather and structures | - | - | 7% | 0 a day, the least in 5 years | - |
| Autumn | 10 | 6% | 7% | 0 a day, more than 3 of the other 4 years | - |
| External | - | - | 4% | 0 a day, the least in 5 years | - |
| Network management | 59 | 35% | 17% | 2 a day, more than 1 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 25 | 15% | 16% | 1 a day, more than 2 of the other 4 years | - |
| Traincrew | 6 | 4% | 11% | 0 a day, the least in 5 years | 1 |
| Stations | 14 | 8% | 3% | 1 a day, more than 2 of the other 4 years | - |
| Operations | - | - | 5% | 0 a day, the least in 5 years | - |
| Operator, other | 15 | 9% | 7% | 1 a day, more than 3 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 48 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 34 |
| T2 | Delay at unstaffed station to non-DOO train | 10 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 9 |
| IC | Track circuit failure (including no fault found) | 7 |
| M0 | Confirmed train cab based safety system fault (including GSMR) | 6 |
| MU | Depot operating problem | 6 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 6 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 6 |
| Q3 | NZ Pumps T | 6 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 646 |
| T2 | Delay at unstaffed station to non-DOO train | 551 |
| TG | Driver | 526 |
| IB | Points failure (including no fault found) | 443 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 435 |
| I5 | Possession over-run from planned work | 326 |
| ID | Level crossing faults and failure incl. barrow/foot crossings and crossing treadles | 288 |
| IC | Track circuit failure (including no fault found) | 264 |
| XP | BRIDGE HIT | 264 |
| TH | (Senior) Conductor/Train Manager | 244 |