Thames Ditton
0 delay minutes
No delay was picked up at Thames Ditton in the four weeks to 9 December 2023.
100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | Trains cancelled |
|---|---|---|---|---|
| Network Rail's causes | ||||
| Track | - | - | 8% | - |
| Signals, points and power | - | - | 16% | - |
| Weather and structures | - | - | 7% | - |
| Autumn | - | - | 7% | - |
| External | - | - | 4% | - |
| Network management | - | - | 17% | - |
| The operators' causes | ||||
| Train faults | - | - | 16% | - |
| Traincrew | - | - | 11% | - |
| Stations | - | - | 3% | - |
| Operations | - | - | 5% | - |
| Operator, other | - | - | 7% | - |
Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| Nothing logged. | ||
| Code | What Network Rail logged | Minutes |
|---|---|---|
| II | Signalling lineside cable fault | 54 |
| VZ | Other passenger or external causes the responsibility of TOC | 34 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 26 |
| XO | External trees, building or structures encroaching or falling onto network infrastructure (not weather or vandalism) | 17 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 16 |
| TG | Driver | 15 |
| OS | Late start or delays to Railhead Conditioning or Ghost Train due to its own activity and not in reaction to another incident | 10 |
| JX | Miscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains) | 7 |
| M7 | Door and Door system faults | 6 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 5 |