220 delay minutes

Most of the delay picked up at Tilbury Town in the four weeks to 9 December 2023 came from track faults.

6% of these minutes were knock-on from something that happened elsewhere first. 30% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideTrains cancelled
Network Rail's causes
Track15470%8%-
Signals, points and power115%16%-
Weather and structures--7%-
Autumn52%7%-
External63%4%-
Network management188%17%-
The operators' causes
Train faults42%16%-
Traincrew--11%-
Stations2<1%3%-
Operations--5%-
Operator, other209%7%-

Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.154
VHPassenger Communication cord, door egress or emergency train alarm operated12
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure6
JPFailure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards6
XNRoad or crossing related incidents inc. cars on line, crossing misuse and priority to emergency services (NOT bridge strikes)6
MPRail / wheel interface, adhesion problems (including ice on the running rail)5
Q3NZ Pumps T5
MUDepot operating problem4
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)4
FWLate start/yard overtime not explained by Operator3
Since 2018
CodeWhat Network Rail loggedMinutes
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.1,084
IVCutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure)685
VHPassenger Communication cord, door egress or emergency train alarm operated189
IDLevel crossing faults and failure incl. barrow/foot crossings and crossing treadles180
I8Animal Strike or Incursion within the control of Network Rail178
XDLevel Crossing Incidents including misuse and emergency services being prioritised over rail services157
XNRoad or crossing related incidents inc. cars on line, crossing misuse and priority to emergency services (NOT bridge strikes)144
MDTechnical failures below the solebar143
OCSignaller including mis-routing (not ERTM /ETCS related)122
TGDriver119