Tipton
0 delay minutes
No delay was picked up at Tipton in the four weeks to 9 December 2023.
100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | Trains cancelled |
|---|---|---|---|---|
| Network Rail's causes | ||||
| Track | - | - | 8% | - |
| Signals, points and power | - | - | 16% | - |
| Weather and structures | - | - | 7% | - |
| Autumn | - | - | 7% | - |
| External | - | - | 4% | - |
| Network management | - | - | 17% | - |
| The operators' causes | ||||
| Train faults | - | - | 16% | - |
| Traincrew | - | - | 11% | - |
| Stations | - | - | 3% | - |
| Operations | - | - | 5% | - |
| Operator, other | - | - | 7% | - |
Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| Nothing logged. | ||
| Code | What Network Rail logged | Minutes |
|---|---|---|
| XO | External trees, building or structures encroaching or falling onto network infrastructure (not weather or vandalism) | 16 |
| IC | Track circuit failure (including no fault found) | 10 |
| TG | Driver | 5 |
| R3 | Station Staff unavailable - missing or uncovered | 3 |
| TH | (Senior) Conductor/Train Manager | 3 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 2 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 2 |
| Q3 | NZ Pumps T | 2 |