Tir-phil
87 delay minutes
The biggest share (41%) of the delay picked up at Tir-phil in the four weeks to 9 December 2023 came from the operators' own operations.
71% of these minutes were knock-on from something that happened elsewhere first. 92% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | Trains cancelled |
|---|---|---|---|---|
| Network Rail's causes | ||||
| Track | - | - | 8% | - |
| Signals, points and power | - | - | 16% | - |
| Weather and structures | - | - | 7% | - |
| Autumn | - | - | 7% | - |
| External | - | - | 4% | - |
| Network management | 15 | 17% | 17% | - |
| The operators' causes | ||||
| Train faults | 11 | 13% | 16% | - |
| Traincrew | 19 | 22% | 11% | - |
| Stations | - | - | 3% | - |
| Operations | 36 | 41% | 5% | - |
| Operator, other | 6 | 7% | 7% | - |
Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TZ | Other Passenger Train Operating Company causes | 36 |
| I8 | Animal Strike or Incursion within the control of Network Rail | 10 |
| TH | (Senior) Conductor/Train Manager | 8 |
| T3 | Waiting connections from other transport modes | 7 |
| VZ | Other passenger or external causes the responsibility of TOC | 6 |
| ON | Delays not properly investigated by Network Rail | 5 |
| M8 | Technical failures above the Solebar | 4 |
| MD | Technical failures below the solebar | 4 |
| TG | Driver | 4 |
| M7 | Door and Door system faults | 3 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| JS | Condition of Track TSR outside the Timetable Planning Rules | 714 |
| MD | Technical failures below the solebar | 520 |
| M8 | Technical failures above the Solebar | 387 |
| TG | Driver | 347 |
| J3 | Axle Counter Failure | 324 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 207 |
| TZ | Other Passenger Train Operating Company causes | 200 |
| TH | (Senior) Conductor/Train Manager | 195 |
| T2 | Delay at unstaffed station to non-DOO train | 181 |
| OU | Delays not Investigated by Network Rail | 162 |