Thorne North
109 delay minutes
The biggest share (22%) of the delay picked up at Thorne North in the four weeks to 9 December 2023 came from autumn leaves.
36% of these minutes were knock-on from something that happened elsewhere first. 76% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | Trains cancelled |
|---|---|---|---|---|
| Network Rail's causes | ||||
| Track | 5 | 5% | 8% | - |
| Signals, points and power | 3 | 3% | 16% | - |
| Weather and structures | 9 | 8% | 7% | - |
| Autumn | 24 | 22% | 7% | - |
| External | 24 | 22% | 4% | - |
| Network management | 14 | 13% | 17% | - |
| The operators' causes | ||||
| Train faults | 8 | 7% | 16% | - |
| Traincrew | 3 | 3% | 11% | - |
| Stations | 8 | 7% | 3% | - |
| Operations | 5 | 5% | 5% | - |
| Operator, other | 6 | 6% | 7% | - |
Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| XN | Road or crossing related incidents inc. cars on line, crossing misuse and priority to emergency services (NOT bridge strikes) | 24 |
| QJ | Special working for leaf-fall track circuit operation | 18 |
| OU | Delays not Investigated by Network Rail | 10 |
| RC | re-booked assistance for a person with reduced mobility joining/alighting, | 8 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 6 |
| JB | Reactionary Delay to 'P' coded TSRs | 5 |
| MD | Technical failures below the solebar | 4 |
| MU | Depot operating problem | 4 |
| ZU | No Cause Identified After investigation by both Parties | 4 |
| FW | Late start/yard overtime not explained by Operator | 3 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IC | Track circuit failure (including no fault found) | 513 |
| JL | Safety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff) | 335 |
| IB | Points failure (including no fault found) | 304 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 300 |
| IV | Cutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure) | 298 |
| II | Signalling lineside cable fault | 185 |
| RC | re-booked assistance for a person with reduced mobility joining/alighting, | 177 |
| MD | Technical failures below the solebar | 167 |
| IE | Signalling Functional Power Supply Failure | 133 |
| TG | Driver | 133 |