Todmorden
248 delay minutes
The biggest share (19%) of the delay picked up at Todmorden in the four weeks to 9 December 2023 came from autumn leaves.
88% of these minutes were knock-on from something that happened elsewhere first. 72% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | Trains cancelled |
|---|---|---|---|---|
| Network Rail's causes | ||||
| Track | 47 | 19% | 8% | - |
| Signals, points and power | 25 | 10% | 16% | 1 |
| Weather and structures | 5 | 2% | 7% | - |
| Autumn | 48 | 19% | 7% | - |
| External | - | - | 4% | - |
| Network management | 24 | 10% | 17% | 5 |
| The operators' causes | ||||
| Train faults | 23 | 9% | 16% | 1 |
| Traincrew | 24 | 10% | 11% | 5 |
| Stations | 3 | 1% | 3% | - |
| Operations | 8 | 3% | 5% | - |
| Operator, other | 41 | 17% | 7% | - |
Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 47 |
| Q3 | NZ Pumps T | 41 |
| TT | Leaf fall Neutral | 41 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 16 |
| T3 | Waiting connections from other transport modes | 14 |
| J3 | Axle Counter Failure | 13 |
| TG | Driver | 10 |
| JL | Safety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff) | 9 |
| J5 | Infrastructure Asset fault reported but proven to be mistaken | 8 |
| M0 | Confirmed train cab based safety system fault (including GSMR) | 7 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 197 |
| Q3 | NZ Pumps T | 188 |
| JK | Flooding not due to exceptional weather | 141 |
| X2 | Severe flooding beyond that which could be mitigated on Network Rail infrastructure | 129 |
| TT | Leaf fall Neutral | 127 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 87 |
| MD | Technical failures below the solebar | 85 |
| Q1 | Takeback Pumps | 85 |
| T3 | Waiting connections from other transport modes | 69 |
| ID | Level crossing faults and failure incl. barrow/foot crossings and crossing treadles | 63 |