Leaves on the Line

Topsham

TOP Western route
CSV JSON

578 delay minutes

The biggest share (34%) of the delay picked up at Topsham in the four weeks to 9 December 2023 came from how the network was run.

90% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track153%8% 1 a day, more than 2 of the other 4 years-
Signals, points and power417%16% 1 a day, more than 1 of the other 4 years1
Weather and structures5<1%7% 0 a day, more than 1 of the other 4 years-
Autumn7313%7% 3 a day, more than 2 of the other 4 years-
External102%4% 0 a day, more than 1 of the other 4 years-
Network management19534%17% 7 a day, the most in 5 years1
The operators' causes
Train faults12722%16% 5 a day, the least in 5 years1
Traincrew529%11% 2 a day, more than 3 of the other 4 years-
Stations91%3% 0 a day, the least in 5 years-
Operations214%5% 1 a day, the most in 5 years-
Operator, other315%7% 1 a day, more than 1 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
I8Animal Strike or Incursion within the control of Network Rail74
OSLate start or delays to Railhead Conditioning or Ghost Train due to its own activity and not in reaction to another incident36
MSPlanned underpowered or shortformed service and or vehicle, incl. exam set swaps30
MDTechnical failures below the solebar29
ONDelays not properly investigated by Network Rail27
Q3NZ Pumps T25
TGDriver25
TH(Senior) Conductor/Train Manager25
TTLeaf fall Neutral25
OEFailure to lay Sandite or operate Railhead Conditioning train as programmed24
Since 2018
CodeWhat Network Rail loggedMinutes
MDTechnical failures below the solebar2,359
M7Door and Door system faults1,900
TGDriver1,389
MSPlanned underpowered or shortformed service and or vehicle, incl. exam set swaps1,220
ICTrack circuit failure (including no fault found)1,168
RBPassengers joining/alighting1,061
M8Technical failures above the Solebar1,052
RQUn-booked assistance for a person with reduced mobility joining/alighting,905
MNBrake and brake systems faults; including wheel flats where no other cause had been identified848
ZUNo Cause Identified After investigation by both Parties836