Thorpe Bay
129 delay minutes
Most of the delay picked up at Thorpe Bay in the four weeks to 9 December 2023 came from faulty trains.
84% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 4 | 3% | 8% | 0 a day, more than 2 of the other 4 years | - |
| Signals, points and power | 10 | 8% | 16% | 0 a day, more than 2 of the other 4 years | - |
| Weather and structures | - | - | 7% | 0 a day, the least in 5 years | - |
| Autumn | 1 | <1% | 7% | 0 a day, the most in 5 years | - |
| External | - | - | 4% | 0 a day, the least in 5 years | - |
| Network management | - | - | 17% | 0 a day, the least in 5 years | - |
| The operators' causes | |||||
| Train faults | 65 | 50% | 16% | 2 a day, the most in 5 years | 2 |
| Traincrew | 9 | 7% | 11% | 0 a day, more than 1 of the other 4 years | - |
| Stations | 14 | 11% | 3% | 1 a day, the most in 5 years | - |
| Operations | 14 | 11% | 5% | 1 a day, more than 2 of the other 4 years | - |
| Operator, other | 12 | 9% | 7% | 0 a day, more than 3 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| MY | Coupler, Coupler system and Jumper cable faults | 25 |
| MU | Depot operating problem | 17 |
| TA | Train-crew/loco/stock/unit diagram issues | 14 |
| M8 | Technical failures above the Solebar | 13 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 11 |
| J0 | Telecom equipment radio failure (GSM-R) | 10 |
| TG | Driver | 9 |
| R2 | Late TRTS given by station staff | 8 |
| RB | Passengers joining/alighting | 6 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 4 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| MU | Depot operating problem | 2,237 |
| TG | Driver | 884 |
| M8 | Technical failures above the Solebar | 459 |
| MD | Technical failures below the solebar | 374 |
| QM | Train schedule/STP Process including erroneous simplifiers | 362 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 325 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 297 |
| OH | ARS / TMS / SARS software problem (excluding scheduling issues and technical failures) | 287 |
| TW | Driver adhering to company professional driving standards or policy | 247 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 239 |