Leaves on the Line

Treherbert

TRB Cardiff Valleys route
CSV JSON

0 delay minutes

No delay was picked up at Treherbert in the four weeks to 9 December 2023.

100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track--8% 0 a day, the least in 5 years-
Signals, points and power--16% 0 a day, the least in 5 years-
Weather and structures--7% 0 a day, the least in 5 years-
Autumn--7% 0 a day, the least in 5 years-
External--4% 0 a day, the least in 5 years-
Network management--17% 0 a day, the least in 5 years-
The operators' causes
Train faults--16% 0 a day, the least in 5 years-
Traincrew--11% 0 a day, the least in 5 years-
Stations--3% 0 a day, the least in 5 years-
Operations--5% 0 a day, the least in 5 years-
Operator, other--7% 0 a day, the least in 5 years-

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
Nothing logged.
Since 2018
CodeWhat Network Rail loggedMinutes
OUDelays not Investigated by Network Rail2,375
T2Delay at unstaffed station to non-DOO train2,069
TGDriver1,762
ILToken equipment failure (including no fault found)1,693
MSPlanned underpowered or shortformed service and or vehicle, incl. exam set swaps1,303
ZYUnivestigated station overtime System Roll-up Only1,286
TH(Senior) Conductor/Train Manager1,232
MDTechnical failures below the solebar973
IBPoints failure (including no fault found)859
M8Technical failures above the Solebar781