Leaves on the Line

Trefforest

TRF Cardiff Valleys route
CSV JSON

880 delay minutes

Most of the delay picked up at Trefforest in the four weeks to 9 December 2023 came from how the network was run.

2% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track--8% 0 a day, the least in 5 years-
Signals, points and power8<1%16% 0 a day, the most in 5 years-
Weather and structures--7% 0 a day, the least in 5 years-
Autumn--7% 0 a day, the least in 5 years-
External--4% 0 a day, the least in 5 years-
Network management83094%17% 30 a day, the most in 5 years-
The operators' causes
Train faults192%16% 1 a day, more than 2 of the other 4 years-
Traincrew121%11% 0 a day, more than 3 of the other 4 years-
Stations3<1%3% 0 a day, more than 3 of the other 4 years-
Operations8<1%5% 0 a day, the most in 5 years-
Operator, other--7% 0 a day, the least in 5 years-

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
OTOps Safety TSR implemented for sighting issues relating to foot crossings, level crossings or signals (Not vegetation caused)820
MTConfirmed train borne safety system faults (not cab based)14
TITraincrew rostering problem9
J3Axle Counter Failure8
TZOther Passenger Train Operating Company causes8
JPFailure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards6
MDTechnical failures below the solebar3
OCSignaller including mis-routing (not ERTM /ETCS related)3
RQUn-booked assistance for a person with reduced mobility joining/alighting,3
TGDriver3
Since 2018
CodeWhat Network Rail loggedMinutes
QAWTT schedule and or LTP Process including erroneous simplifiers2,243
OTOps Safety TSR implemented for sighting issues relating to foot crossings, level crossings or signals (Not vegetation caused)850
TGDriver423
ICTrack circuit failure (including no fault found)421
JATSR speed restrictions for track work outside of the Timetable Planning Rules410
OUDelays not Investigated by Network Rail399
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions382
MDTechnical failures below the solebar373
JHCritical Rail Temperature speeds, (other than buckled rails)357
I8Animal Strike or Incursion within the control of Network Rail274