Trefforest
880 delay minutes
Most of the delay picked up at Trefforest in the four weeks to 9 December 2023 came from how the network was run.
2% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | - | - | 8% | 0 a day, the least in 5 years | - |
| Signals, points and power | 8 | <1% | 16% | 0 a day, the most in 5 years | - |
| Weather and structures | - | - | 7% | 0 a day, the least in 5 years | - |
| Autumn | - | - | 7% | 0 a day, the least in 5 years | - |
| External | - | - | 4% | 0 a day, the least in 5 years | - |
| Network management | 830 | 94% | 17% | 30 a day, the most in 5 years | - |
| The operators' causes | |||||
| Train faults | 19 | 2% | 16% | 1 a day, more than 2 of the other 4 years | - |
| Traincrew | 12 | 1% | 11% | 0 a day, more than 3 of the other 4 years | - |
| Stations | 3 | <1% | 3% | 0 a day, more than 3 of the other 4 years | - |
| Operations | 8 | <1% | 5% | 0 a day, the most in 5 years | - |
| Operator, other | - | - | 7% | 0 a day, the least in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| OT | Ops Safety TSR implemented for sighting issues relating to foot crossings, level crossings or signals (Not vegetation caused) | 820 |
| MT | Confirmed train borne safety system faults (not cab based) | 14 |
| TI | Traincrew rostering problem | 9 |
| J3 | Axle Counter Failure | 8 |
| TZ | Other Passenger Train Operating Company causes | 8 |
| JP | Failure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards | 6 |
| MD | Technical failures below the solebar | 3 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 3 |
| RQ | Un-booked assistance for a person with reduced mobility joining/alighting, | 3 |
| TG | Driver | 3 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| QA | WTT schedule and or LTP Process including erroneous simplifiers | 2,243 |
| OT | Ops Safety TSR implemented for sighting issues relating to foot crossings, level crossings or signals (Not vegetation caused) | 850 |
| TG | Driver | 423 |
| IC | Track circuit failure (including no fault found) | 421 |
| JA | TSR speed restrictions for track work outside of the Timetable Planning Rules | 410 |
| OU | Delays not Investigated by Network Rail | 399 |
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 382 |
| MD | Technical failures below the solebar | 373 |
| JH | Critical Rail Temperature speeds, (other than buckled rails) | 357 |
| I8 | Animal Strike or Incursion within the control of Network Rail | 274 |