2,392 delay minutes

The biggest share (38%) of the delay picked up at Tring in the four weeks to 9 December 2023 came from signal, points and power faults.

60% of these minutes were knock-on from something that happened elsewhere first. 92% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track592%8% 2 a day, more than 1 of the other 4 years-
Signals, points and power91938%16% 33 a day, the most in 5 years12
Weather and structures251%7% 1 a day, more than 2 of the other 4 years-
Autumn9<1%7% 0 a day, more than 1 of the other 4 years-
External6<1%4% 0 a day, more than 2 of the other 4 years-
Network management66428%17% 24 a day, the most in 5 years6
The operators' causes
Train faults35115%16% 13 a day, more than 3 of the other 4 years20
Traincrew1446%11% 5 a day, more than 1 of the other 4 years6
Stations23<1%3% 1 a day, more than 1 of the other 4 years-
Operations402%5% 1 a day, more than 2 of the other 4 years-
Operator, other1536%7% 5 a day, more than 1 of the other 4 years1

Period by period

Delay minutes a day, period by period. Gridlines every 50 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
JLSafety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff)475
IISignalling lineside cable fault362
IHPower Supply And Distribution System Failure174
J3Axle Counter Failure156
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure113
TGDriver113
JPFailure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards111
VHPassenger Communication cord, door egress or emergency train alarm operated105
M8Technical failures above the Solebar81
MDTechnical failures below the solebar72
Since 2018
CodeWhat Network Rail loggedMinutes
IBPoints failure (including no fault found)7,831
TGDriver7,021
J3Axle Counter Failure6,806
IRBroken/cracked/twisted/buckled/flawed rail6,049
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.4,480
I1Overhead line/third rail defect3,479
M8Technical failures above the Solebar3,466
TH(Senior) Conductor/Train Manager2,853
MDTechnical failures below the solebar2,686
M7Door and Door system faults2,685