Leaves on the Line

Trimley

TRM Anglia route
CSV JSON

44 delay minutes

The biggest share (23%) of the delay picked up at Trimley in the four weeks to 9 December 2023 came from other operator causes.

86% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideTrains cancelled
Network Rail's causes
Track25%8%-
Signals, points and power716%16%-
Weather and structures--7%-
Autumn--7%-
External716%4%-
Network management920%17%-
The operators' causes
Train faults--16%-
Traincrew920%11%-
Stations--3%-
Operations--5%-
Operator, other1023%7%-

Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.

Period by period

Delay minutes a day, period by period. Gridlines every 2 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
TGDriver9
IASignal failure (including no fault found)7
XKNational Grid Power Failure - local area also affected (inc outage, surges, blips where working standby generator/UPS installed)7
ADOff Network Rail network Terminal or Yard staff shortage including reactionary congestion caused by shortage4
FWLate start/yard overtime not explained by Operator3
J5Infrastructure Asset fault reported but proven to be mistaken3
JPFailure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards3
OCSignaller including mis-routing (not ERTM /ETCS related)3
ACWaiting Train preparation or completion of TOPS list/RT39732
ITRough ride or bumps reported - cause not known or no fault found2
Since 2018
CodeWhat Network Rail loggedMinutes
ACWaiting Train preparation or completion of TOPS list/RT3973401
JLSafety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff)298
FWLate start/yard overtime not explained by Operator214
IDLevel crossing faults and failure incl. barrow/foot crossings and crossing treadles197
OCSignaller including mis-routing (not ERTM /ETCS related)142
MCDiesel Loco failure, defect, attention142
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.133
FHFOC Planning issue (not diagramming or rostering)105
FETrain Crew not available including after rest83
MUDepot operating problem83