Truro
848 delay minutes
The biggest share (18%) of the delay picked up at Truro in the four weeks to 9 December 2023 came from how the network was run.
60% of these minutes were knock-on from something that happened elsewhere first. 98% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 77 | 9% | 8% | 3 a day, the most in 5 years | 2 |
| Signals, points and power | 156 | 18% | 16% | 6 a day, more than 1 of the other 4 years | - |
| Weather and structures | 49 | 6% | 7% | 2 a day, more than 1 of the other 4 years | 3 |
| Autumn | 99 | 12% | 7% | 4 a day, more than 2 of the other 4 years | - |
| External | 25 | 3% | 4% | 1 a day, more than 2 of the other 4 years | 6 |
| Network management | 157 | 18% | 17% | 6 a day, more than 1 of the other 4 years | 10 |
| The operators' causes | |||||
| Train faults | 78 | 9% | 16% | 3 a day, the least in 5 years | 18 |
| Traincrew | 89 | 10% | 11% | 3 a day, the most in 5 years | 21 |
| Stations | 11 | 1% | 3% | 0 a day, more than 1 of the other 4 years | - |
| Operations | 47 | 6% | 5% | 2 a day, the most in 5 years | 1 |
| Operator, other | 61 | 7% | 7% | 2 a day, the least in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| OU | Delays not Investigated by Network Rail | 85 |
| IK | Telecom equipment failure (including no fault found) | 77 |
| TG | Driver | 71 |
| Q3 | NZ Pumps T | 61 |
| TT | Leaf fall Neutral | 61 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 40 |
| QI | Cautioning due to railhead leaf contamination | 38 |
| J3 | Axle Counter Failure | 32 |
| IA | Signal failure (including no fault found) | 29 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 29 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| JS | Condition of Track TSR outside the Timetable Planning Rules | 3,961 |
| MD | Technical failures below the solebar | 3,526 |
| TG | Driver | 2,922 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 2,910 |
| ZY | Univestigated station overtime System Roll-up Only | 2,329 |
| IA | Signal failure (including no fault found) | 2,301 |
| XR | Cable vandalism or theft | 2,292 |
| IC | Track circuit failure (including no fault found) | 1,807 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 1,762 |
| ZU | No Cause Identified After investigation by both Parties | 1,647 |