Truro

TRU Western route
CSV JSON

848 delay minutes

The biggest share (18%) of the delay picked up at Truro in the four weeks to 9 December 2023 came from how the network was run.

60% of these minutes were knock-on from something that happened elsewhere first. 98% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track779%8% 3 a day, the most in 5 years2
Signals, points and power15618%16% 6 a day, more than 1 of the other 4 years-
Weather and structures496%7% 2 a day, more than 1 of the other 4 years3
Autumn9912%7% 4 a day, more than 2 of the other 4 years-
External253%4% 1 a day, more than 2 of the other 4 years6
Network management15718%17% 6 a day, more than 1 of the other 4 years10
The operators' causes
Train faults789%16% 3 a day, the least in 5 years18
Traincrew8910%11% 3 a day, the most in 5 years21
Stations111%3% 0 a day, more than 1 of the other 4 years-
Operations476%5% 2 a day, the most in 5 years1
Operator, other617%7% 2 a day, the least in 5 years-

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
OUDelays not Investigated by Network Rail85
IKTelecom equipment failure (including no fault found)77
TGDriver71
Q3NZ Pumps T61
TTLeaf fall Neutral61
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.40
QICautioning due to railhead leaf contamination38
J3Axle Counter Failure32
IASignal failure (including no fault found)29
IRBroken/cracked/twisted/buckled/flawed rail29
Since 2018
CodeWhat Network Rail loggedMinutes
JSCondition of Track TSR outside the Timetable Planning Rules3,961
MDTechnical failures below the solebar3,526
TGDriver2,922
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail2,910
ZYUnivestigated station overtime System Roll-up Only2,329
IASignal failure (including no fault found)2,301
XRCable vandalism or theft2,292
ICTrack circuit failure (including no fault found)1,807
MNBrake and brake systems faults; including wheel flats where no other cause had been identified1,762
ZUNo Cause Identified After investigation by both Parties1,647