Leaves on the Line

Tutbury & Hatton

TUT East Midlands route
CSV JSON

98 delay minutes

The biggest share (29%) of the delay picked up at Tutbury & Hatton in the four weeks to 9 December 2023 came from how the network was run.

12% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track--8% 0 a day, the least in 5 years-
Signals, points and power2121%16% 1 a day, the least in 5 years-
Weather and structures99%7% 0 a day, more than 3 of the other 4 years-
Autumn1919%7% 1 a day, the most in 5 years-
External--4% 0 a day, the least in 5 years-
Network management2829%17% 1 a day, the most in 5 years-
The operators' causes
Train faults--16% 0 a day, the least in 5 years-
Traincrew1111%11% 0 a day, the most in 5 years-
Stations--3% 0 a day, the least in 5 years-
Operations--5% 0 a day, the least in 5 years-
Operator, other1111%7% 0 a day, more than 3 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 5 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
ZUNo Cause Identified After investigation by both Parties19
IDLevel crossing faults and failure incl. barrow/foot crossings and crossing treadles13
QICautioning due to railhead leaf contamination11
TGDriver11
Q1Takeback Pumps6
IASignal failure (including no fault found)5
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail5
AHCustomer or off Network Rail network yard equipment breakdown/reduced capacity4
QHAdhesion problems due to leaf contamination4
X1Visibility in semaphore signalled areas, or special working for fog and falling snow implemented by NR ¿ in all signalling areas4
Since 2018
CodeWhat Network Rail loggedMinutes
ICTrack circuit failure (including no fault found)465
IASignal failure (including no fault found)421
XKNational Grid Power Failure - local area also affected (inc outage, surges, blips where working standby generator/UPS installed)386
I8Animal Strike or Incursion within the control of Network Rail364
IDLevel crossing faults and failure incl. barrow/foot crossings and crossing treadles343
IBPoints failure (including no fault found)296
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure271
MDTechnical failures below the solebar269
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail238
ZUNo Cause Identified After investigation by both Parties236