Tutbury & Hatton
98 delay minutes
The biggest share (29%) of the delay picked up at Tutbury & Hatton in the four weeks to 9 December 2023 came from how the network was run.
12% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | - | - | 8% | 0 a day, the least in 5 years | - |
| Signals, points and power | 21 | 21% | 16% | 1 a day, the least in 5 years | - |
| Weather and structures | 9 | 9% | 7% | 0 a day, more than 3 of the other 4 years | - |
| Autumn | 19 | 19% | 7% | 1 a day, the most in 5 years | - |
| External | - | - | 4% | 0 a day, the least in 5 years | - |
| Network management | 28 | 29% | 17% | 1 a day, the most in 5 years | - |
| The operators' causes | |||||
| Train faults | - | - | 16% | 0 a day, the least in 5 years | - |
| Traincrew | 11 | 11% | 11% | 0 a day, the most in 5 years | - |
| Stations | - | - | 3% | 0 a day, the least in 5 years | - |
| Operations | - | - | 5% | 0 a day, the least in 5 years | - |
| Operator, other | 11 | 11% | 7% | 0 a day, more than 3 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| ZU | No Cause Identified After investigation by both Parties | 19 |
| ID | Level crossing faults and failure incl. barrow/foot crossings and crossing treadles | 13 |
| QI | Cautioning due to railhead leaf contamination | 11 |
| TG | Driver | 11 |
| Q1 | Takeback Pumps | 6 |
| IA | Signal failure (including no fault found) | 5 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 5 |
| AH | Customer or off Network Rail network yard equipment breakdown/reduced capacity | 4 |
| QH | Adhesion problems due to leaf contamination | 4 |
| X1 | Visibility in semaphore signalled areas, or special working for fog and falling snow implemented by NR ¿ in all signalling areas | 4 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IC | Track circuit failure (including no fault found) | 465 |
| IA | Signal failure (including no fault found) | 421 |
| XK | National Grid Power Failure - local area also affected (inc outage, surges, blips where working standby generator/UPS installed) | 386 |
| I8 | Animal Strike or Incursion within the control of Network Rail | 364 |
| ID | Level crossing faults and failure incl. barrow/foot crossings and crossing treadles | 343 |
| IB | Points failure (including no fault found) | 296 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 271 |
| MD | Technical failures below the solebar | 269 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 238 |
| ZU | No Cause Identified After investigation by both Parties | 236 |