597 delay minutes
The biggest share (42%) of the delay picked up at Tiverton Parkway in the four weeks to 9 December 2023 came from signal, points and power faults.
26% of these minutes were knock-on from something that happened elsewhere first. 99% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 17 | 3% | 8% | 1 a day, the most in 5 years | - |
| Signals, points and power | 253 | 42% | 16% | 9 a day, the most in 5 years | - |
| Weather and structures | 103 | 17% | 7% | 4 a day, more than 2 of the other 4 years | - |
| Autumn | 42 | 7% | 7% | 1 a day, the most in 5 years | - |
| External | 37 | 6% | 4% | 1 a day, the most in 5 years | - |
| Network management | 52 | 9% | 17% | 2 a day, more than 2 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 40 | 7% | 16% | 1 a day, more than 1 of the other 4 years | - |
| Traincrew | 5 | <1% | 11% | 0 a day, more than 1 of the other 4 years | - |
| Stations | 4 | <1% | 3% | 0 a day, the least in 5 years | - |
| Operations | 4 | <1% | 5% | 0 a day, more than 2 of the other 4 years | - |
| Operator, other | 41 | 7% | 7% | 1 a day, the most in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| ID | Level crossing faults and failure incl. barrow/foot crossings and crossing treadles | 150 |
| JK | Flooding not due to exceptional weather | 94 |
| IA | Signal failure (including no fault found) | 56 |
| Q3 | NZ Pumps T | 34 |
| TT | Leaf fall Neutral | 34 |
| ZU | No Cause Identified After investigation by both Parties | 24 |
| MD | Technical failures below the solebar | 23 |
| I5 | Possession over-run from planned work | 21 |
| IK | Telecom equipment failure (including no fault found) | 20 |
| IB | Points failure (including no fault found) | 16 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IC | Track circuit failure (including no fault found) | 2,514 |
| X2 | Severe flooding beyond that which could be mitigated on Network Rail infrastructure | 2,223 |
| MD | Technical failures below the solebar | 1,389 |
| M8 | Technical failures above the Solebar | 1,348 |
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 1,000 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 910 |
| ID | Level crossing faults and failure incl. barrow/foot crossings and crossing treadles | 841 |
| TG | Driver | 751 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 729 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 589 |