597 delay minutes

The biggest share (42%) of the delay picked up at Tiverton Parkway in the four weeks to 9 December 2023 came from signal, points and power faults.

26% of these minutes were knock-on from something that happened elsewhere first. 99% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track173%8% 1 a day, the most in 5 years-
Signals, points and power25342%16% 9 a day, the most in 5 years-
Weather and structures10317%7% 4 a day, more than 2 of the other 4 years-
Autumn427%7% 1 a day, the most in 5 years-
External376%4% 1 a day, the most in 5 years-
Network management529%17% 2 a day, more than 2 of the other 4 years-
The operators' causes
Train faults407%16% 1 a day, more than 1 of the other 4 years-
Traincrew5<1%11% 0 a day, more than 1 of the other 4 years-
Stations4<1%3% 0 a day, the least in 5 years-
Operations4<1%5% 0 a day, more than 2 of the other 4 years-
Operator, other417%7% 1 a day, the most in 5 years-

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
IDLevel crossing faults and failure incl. barrow/foot crossings and crossing treadles150
JKFlooding not due to exceptional weather94
IASignal failure (including no fault found)56
Q3NZ Pumps T34
TTLeaf fall Neutral34
ZUNo Cause Identified After investigation by both Parties24
MDTechnical failures below the solebar23
I5Possession over-run from planned work21
IKTelecom equipment failure (including no fault found)20
IBPoints failure (including no fault found)16
Since 2018
CodeWhat Network Rail loggedMinutes
ICTrack circuit failure (including no fault found)2,514
X2Severe flooding beyond that which could be mitigated on Network Rail infrastructure2,223
MDTechnical failures below the solebar1,389
M8Technical failures above the Solebar1,348
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions1,000
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.910
IDLevel crossing faults and failure incl. barrow/foot crossings and crossing treadles841
TGDriver751
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure729
IRBroken/cracked/twisted/buckled/flawed rail589