Town Green
12 delay minutes
Most of the delay picked up at Town Green in the four weeks to 9 December 2023 came from the operators' own operations.
0% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | Trains cancelled |
|---|---|---|---|---|
| Network Rail's causes | ||||
| Track | - | - | 8% | - |
| Signals, points and power | - | - | 16% | - |
| Weather and structures | - | - | 7% | - |
| Autumn | - | - | 7% | - |
| External | - | - | 4% | - |
| Network management | - | - | 17% | 1 |
| The operators' causes | ||||
| Train faults | - | - | 16% | - |
| Traincrew | - | - | 11% | - |
| Stations | 3 | 25% | 3% | - |
| Operations | 9 | 75% | 5% | - |
| Operator, other | - | - | 7% | - |
Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 9 |
| RB | Passengers joining/alighting | 3 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 33 |
| R7 | Station delays as a result of overcrowding due to planned events (e.g. sports fixtures, concerts) | 20 |
| M8 | Technical failures above the Solebar | 16 |
| MD | Technical failures below the solebar | 12 |
| I1 | Overhead line/third rail defect | 9 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 9 |
| I5 | Possession over-run from planned work | 5 |
| RB | Passengers joining/alighting | 3 |