Twyford
4,866 delay minutes
The biggest share (35%) of the delay picked up at Twyford in the four weeks to 9 December 2023 came from track faults.
69% of these minutes were knock-on from something that happened elsewhere first. 75% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 1,694 | 35% | 8% | 61 a day, the most in 5 years | 5 |
| Signals, points and power | 711 | 15% | 16% | 25 a day, more than 2 of the other 4 years | 1 |
| Weather and structures | 66 | 1% | 7% | 2 a day, more than 3 of the other 4 years | 1 |
| Autumn | 75 | 2% | 7% | 3 a day, more than 2 of the other 4 years | - |
| External | 106 | 2% | 4% | 4 a day, the most in 5 years | 1 |
| Network management | 766 | 16% | 17% | 27 a day, more than 3 of the other 4 years | 1 |
| The operators' causes | |||||
| Train faults | 719 | 15% | 16% | 26 a day, more than 3 of the other 4 years | - |
| Traincrew | 280 | 6% | 11% | 10 a day, more than 3 of the other 4 years | 7 |
| Stations | 37 | <1% | 3% | 1 a day, the least in 5 years | - |
| Operations | 105 | 2% | 5% | 4 a day, more than 3 of the other 4 years | - |
| Operator, other | 309 | 6% | 7% | 11 a day, more than 3 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 657 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 607 |
| IT | Rough ride or bumps reported - cause not known or no fault found | 400 |
| OU | Delays not Investigated by Network Rail | 392 |
| IB | Points failure (including no fault found) | 364 |
| TG | Driver | 228 |
| V8 | Train striking or being struck by a bird | 217 |
| M7 | Door and Door system faults | 154 |
| IA | Signal failure (including no fault found) | 127 |
| I2 | AC/DC trip (including no fault or cause found) | 97 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IB | Points failure (including no fault found) | 11,464 |
| TG | Driver | 8,525 |
| J3 | Axle Counter Failure | 7,630 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 6,867 |
| IA | Signal failure (including no fault found) | 5,618 |
| I1 | Overhead line/third rail defect | 4,920 |
| M8 | Technical failures above the Solebar | 4,638 |
| ZU | No Cause Identified After investigation by both Parties | 4,545 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 4,471 |
| MD | Technical failures below the solebar | 4,363 |