Tyseley
1,130 delay minutes
The biggest share (17%) of the delay picked up at Tyseley in the four weeks to 9 December 2023 came from signal, points and power faults.
65% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 28 | 2% | 8% | 1 a day, more than 1 of the other 4 years | - |
| Signals, points and power | 198 | 17% | 16% | 7 a day, more than 2 of the other 4 years | - |
| Weather and structures | 14 | 1% | 7% | 1 a day, the least in 5 years | - |
| Autumn | 140 | 12% | 7% | 5 a day, the most in 5 years | - |
| External | 47 | 4% | 4% | 2 a day, more than 3 of the other 4 years | - |
| Network management | 162 | 14% | 17% | 6 a day, the least in 5 years | - |
| The operators' causes | |||||
| Train faults | 110 | 10% | 16% | 4 a day, more than 1 of the other 4 years | - |
| Traincrew | 194 | 17% | 11% | 7 a day, more than 1 of the other 4 years | - |
| Stations | 94 | 8% | 3% | 3 a day, more than 2 of the other 4 years | - |
| Operations | 11 | <1% | 5% | 0 a day, more than 1 of the other 4 years | - |
| Operator, other | 134 | 12% | 7% | 5 a day, more than 2 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 134 |
| IB | Points failure (including no fault found) | 107 |
| TT | Leaf fall Neutral | 69 |
| Q3 | NZ Pumps T | 61 |
| XP | BRIDGE HIT | 47 |
| QI | Cautioning due to railhead leaf contamination | 42 |
| TH | (Senior) Conductor/Train Manager | 42 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 39 |
| MD | Technical failures below the solebar | 35 |
| RQ | Un-booked assistance for a person with reduced mobility joining/alighting, | 34 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| JS | Condition of Track TSR outside the Timetable Planning Rules | 10,018 |
| TG | Driver | 6,984 |
| MD | Technical failures below the solebar | 4,714 |
| IB | Points failure (including no fault found) | 3,134 |
| ZU | No Cause Identified After investigation by both Parties | 3,123 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 2,909 |
| TH | (Senior) Conductor/Train Manager | 2,716 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 2,322 |
| IC | Track circuit failure (including no fault found) | 2,301 |
| M8 | Technical failures above the Solebar | 2,294 |