3 delay minutes
Most of the delay picked up at Ulceby in the four weeks to 9 December 2023 came from autumn leaves.
100% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | Trains cancelled |
|---|---|---|---|---|
| Network Rail's causes | ||||
| Track | - | - | 8% | - |
| Signals, points and power | - | - | 16% | 1 |
| Weather and structures | - | - | 7% | - |
| Autumn | 3 | 100% | 7% | 1 |
| External | - | - | 4% | 1 |
| Network management | - | - | 17% | - |
| The operators' causes | ||||
| Train faults | - | - | 16% | - |
| Traincrew | - | - | 11% | 1 |
| Stations | - | - | 3% | - |
| Operations | - | - | 5% | - |
| Operator, other | - | - | 7% | - |
Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| QJ | Special working for leaf-fall track circuit operation | 3 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IB | Points failure (including no fault found) | 25 |
| JX | Miscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains) | 16 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 12 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 12 |
| XK | National Grid Power Failure - local area also affected (inc outage, surges, blips where working standby generator/UPS installed) | 11 |
| IC | Track circuit failure (including no fault found) | 11 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 9 |
| J3 | Axle Counter Failure | 7 |
| TH | (Senior) Conductor/Train Manager | 7 |
| QJ | Special working for leaf-fall track circuit operation | 6 |