Leaves on the Line

Ulceby

ULC North & East route
CSV JSON

3 delay minutes

Most of the delay picked up at Ulceby in the four weeks to 9 December 2023 came from autumn leaves.

100% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideTrains cancelled
Network Rail's causes
Track--8%-
Signals, points and power--16%1
Weather and structures--7%-
Autumn3100%7%1
External--4%1
Network management--17%-
The operators' causes
Train faults--16%-
Traincrew--11%1
Stations--3%-
Operations--5%-
Operator, other--7%-

Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.

Period by period

Delay minutes a day, period by period. Gridlines every 1 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
QJSpecial working for leaf-fall track circuit operation3
Since 2018
CodeWhat Network Rail loggedMinutes
IBPoints failure (including no fault found)25
JXMiscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains)16
MNBrake and brake systems faults; including wheel flats where no other cause had been identified12
OCSignaller including mis-routing (not ERTM /ETCS related)12
XKNational Grid Power Failure - local area also affected (inc outage, surges, blips where working standby generator/UPS installed)11
ICTrack circuit failure (including no fault found)11
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure9
J3Axle Counter Failure7
TH(Senior) Conductor/Train Manager7
QJSpecial working for leaf-fall track circuit operation6