Ulverston
441 delay minutes
The biggest share (27%) of the delay picked up at Ulverston in the four weeks to 9 December 2023 came from weather and structures.
8% of these minutes were knock-on from something that happened elsewhere first. 97% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | - | - | 8% | 0 a day, the least in 5 years | - |
| Signals, points and power | 34 | 8% | 16% | 1 a day, the most in 5 years | - |
| Weather and structures | 119 | 27% | 7% | 4 a day, the most in 5 years | 1 |
| Autumn | 75 | 17% | 7% | 3 a day, the most in 5 years | - |
| External | - | - | 4% | 0 a day, the least in 5 years | - |
| Network management | 109 | 25% | 17% | 4 a day, the most in 5 years | - |
| The operators' causes | |||||
| Train faults | 16 | 4% | 16% | 1 a day, the least in 5 years | - |
| Traincrew | - | - | 11% | 0 a day, the least in 5 years | - |
| Stations | 11 | 2% | 3% | 0 a day, more than 2 of the other 4 years | - |
| Operations | 3 | <1% | 5% | 0 a day, more than 1 of the other 4 years | - |
| Operator, other | 75 | 17% | 7% | 3 a day, the most in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| Q3 | NZ Pumps T | 75 |
| TT | Leaf fall Neutral | 75 |
| XT | Severe snow or ice affecting infrastructure which is the responsibility of NR (including implementation of Key Route Strategy) | 71 |
| JX | Miscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains) | 64 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 48 |
| OU | Delays not Investigated by Network Rail | 40 |
| IA | Signal failure (including no fault found) | 31 |
| M0 | Confirmed train cab based safety system fault (including GSMR) | 8 |
| R7 | Station delays as a result of overcrowding due to planned events (e.g. sports fixtures, concerts) | 8 |
| M8 | Technical failures above the Solebar | 5 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| RB | Passengers joining/alighting | 1,223 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 1,215 |
| MD | Technical failures below the solebar | 725 |
| TG | Driver | 658 |
| RC | re-booked assistance for a person with reduced mobility joining/alighting, | 565 |
| Q3 | NZ Pumps T | 517 |
| XK | National Grid Power Failure - local area also affected (inc outage, surges, blips where working standby generator/UPS installed) | 483 |
| IB | Points failure (including no fault found) | 387 |
| M7 | Door and Door system faults | 376 |
| TH | (Senior) Conductor/Train Manager | 371 |