Leaves on the Line

Ulverston

ULV North West route
CSV JSON

441 delay minutes

The biggest share (27%) of the delay picked up at Ulverston in the four weeks to 9 December 2023 came from weather and structures.

8% of these minutes were knock-on from something that happened elsewhere first. 97% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track--8% 0 a day, the least in 5 years-
Signals, points and power348%16% 1 a day, the most in 5 years-
Weather and structures11927%7% 4 a day, the most in 5 years1
Autumn7517%7% 3 a day, the most in 5 years-
External--4% 0 a day, the least in 5 years-
Network management10925%17% 4 a day, the most in 5 years-
The operators' causes
Train faults164%16% 1 a day, the least in 5 years-
Traincrew--11% 0 a day, the least in 5 years-
Stations112%3% 0 a day, more than 2 of the other 4 years-
Operations3<1%5% 0 a day, more than 1 of the other 4 years-
Operator, other7517%7% 3 a day, the most in 5 years-

Period by period

Delay minutes a day, period by period. Gridlines every 5 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
Q3NZ Pumps T75
TTLeaf fall Neutral75
XTSevere snow or ice affecting infrastructure which is the responsibility of NR (including implementation of Key Route Strategy)71
JXMiscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains)64
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail48
OUDelays not Investigated by Network Rail40
IASignal failure (including no fault found)31
M0Confirmed train cab based safety system fault (including GSMR)8
R7Station delays as a result of overcrowding due to planned events (e.g. sports fixtures, concerts)8
M8Technical failures above the Solebar5
Since 2018
CodeWhat Network Rail loggedMinutes
RBPassengers joining/alighting1,223
TOTime lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility)1,215
MDTechnical failures below the solebar725
TGDriver658
RCre-booked assistance for a person with reduced mobility joining/alighting,565
Q3NZ Pumps T517
XKNational Grid Power Failure - local area also affected (inc outage, surges, blips where working standby generator/UPS installed)483
IBPoints failure (including no fault found)387
M7Door and Door system faults376
TH(Senior) Conductor/Train Manager371