325 delay minutes

The biggest share (33%) of the delay picked up at Upminster in the four weeks to 9 December 2023 came from how the network was run.

64% of these minutes were knock-on from something that happened elsewhere first. 99% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track144%8% 1 a day, more than 1 of the other 4 years-
Signals, points and power3711%16% 1 a day, more than 2 of the other 4 years-
Weather and structures--7% 0 a day, the least in 5 years-
Autumn3<1%7% 0 a day, more than 3 of the other 4 years-
External3<1%4% 0 a day, the least in 5 years-
Network management10633%17% 4 a day, more than 3 of the other 4 years-
The operators' causes
Train faults6420%16% 2 a day, more than 3 of the other 4 years-
Traincrew5818%11% 2 a day, the most in 5 years-
Stations2<1%3% 0 a day, more than 1 of the other 4 years-
Operations62%5% 0 a day, more than 1 of the other 4 years-
Operator, other3310%7% 1 a day, more than 3 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
M8Technical failures above the Solebar51
JXMiscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains)40
TGDriver37
VHPassenger Communication cord, door egress or emergency train alarm operated27
FCFreight Train Driver error, SPAD, Wrong routing or Missed AWS/DSD [No change]18
OSLate start or delays to Railhead Conditioning or Ghost Train due to its own activity and not in reaction to another incident15
I7Engineer's train late into, from or failed in possession14
ICTrack circuit failure (including no fault found)14
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.14
MDTechnical failures below the solebar12
Since 2018
CodeWhat Network Rail loggedMinutes
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.4,386
IRBroken/cracked/twisted/buckled/flawed rail1,583
TGDriver1,126
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail990
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure975
ICTrack circuit failure (including no fault found)967
XRCable vandalism or theft898
IVCutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure)755
VHPassenger Communication cord, door egress or emergency train alarm operated748
I1Overhead line/third rail defect643