Virginia Water
790 delay minutes
The biggest share (22%) of the delay picked up at Virginia Water in the four weeks to 9 December 2023 came from how the network was run.
64% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | - | - | 8% | 0 a day, the least in 5 years | 1 |
| Signals, points and power | 76 | 10% | 16% | 3 a day, more than 2 of the other 4 years | - |
| Weather and structures | 7 | <1% | 7% | 0 a day, more than 2 of the other 4 years | - |
| Autumn | 167 | 21% | 7% | 6 a day, the most in 5 years | - |
| External | 13 | 2% | 4% | 0 a day, the least in 5 years | - |
| Network management | 172 | 22% | 17% | 6 a day, more than 1 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 42 | 5% | 16% | 2 a day, more than 1 of the other 4 years | - |
| Traincrew | 30 | 4% | 11% | 1 a day, the least in 5 years | - |
| Stations | 88 | 11% | 3% | 3 a day, more than 2 of the other 4 years | - |
| Operations | 24 | 3% | 5% | 1 a day, the most in 5 years | - |
| Operator, other | 171 | 22% | 7% | 6 a day, more than 3 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 128 |
| Q3 | NZ Pumps T | 123 |
| TT | Leaf fall Neutral | 123 |
| T2 | Delay at unstaffed station to non-DOO train | 74 |
| I4 | OHLE/third rail power supply failure or reduction | 72 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 45 |
| QH | Adhesion problems due to leaf contamination | 33 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 22 |
| MD | Technical failures below the solebar | 17 |
| JX | Miscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains) | 15 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 11,553 |
| TG | Driver | 2,808 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 2,711 |
| T2 | Delay at unstaffed station to non-DOO train | 2,411 |
| IC | Track circuit failure (including no fault found) | 2,166 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 1,609 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 1,593 |
| ID | Level crossing faults and failure incl. barrow/foot crossings and crossing treadles | 1,350 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 1,312 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 1,251 |