CSV JSON

720 delay minutes

The biggest share (26%) of the delay picked up at Vauxhall in the four weeks to 9 December 2023 came from how the network was run.

75% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track8712%8% 3 a day, more than 3 of the other 4 years-
Signals, points and power9713%16% 3 a day, more than 1 of the other 4 years-
Weather and structures193%7% 1 a day, more than 2 of the other 4 years-
Autumn162%7% 1 a day, more than 1 of the other 4 years-
External--4% 0 a day, the least in 5 years-
Network management19026%17% 7 a day, the least in 5 years1
The operators' causes
Train faults11216%16% 4 a day, the least in 5 years-
Traincrew9413%11% 3 a day, more than 1 of the other 4 years-
Stations568%3% 2 a day, more than 2 of the other 4 years-
Operations2<1%5% 0 a day, the least in 5 years-
Operator, other487%7% 2 a day, more than 1 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 50 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
TGDriver70
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)64
ICTrack circuit failure (including no fault found)53
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.52
MNBrake and brake systems faults; including wheel flats where no other cause had been identified42
M7Door and Door system faults40
I5Possession over-run from planned work39
OCSignaller including mis-routing (not ERTM /ETCS related)37
IRBroken/cracked/twisted/buckled/flawed rail35
VHPassenger Communication cord, door egress or emergency train alarm operated28
Since 2018
CodeWhat Network Rail loggedMinutes
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)7,760
ICTrack circuit failure (including no fault found)5,086
MDTechnical failures below the solebar4,970
TGDriver4,930
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.4,069
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure3,586
IBPoints failure (including no fault found)3,123
M7Door and Door system faults3,075
OCSignaller including mis-routing (not ERTM /ETCS related)3,032
MNBrake and brake systems faults; including wheel flats where no other cause had been identified2,504