CSV JSON

2,521 delay minutes

The biggest share (17%) of the delay picked up at Warrington Central in the four weeks to 9 December 2023 came from traincrew problems.

73% of these minutes were knock-on from something that happened elsewhere first. 89% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track1717%8% 6 a day, the most in 5 years-
Signals, points and power36915%16% 13 a day, the most in 5 years5
Weather and structures21<1%7% 1 a day, the least in 5 years2
Autumn34714%7% 12 a day, the most in 5 years-
External1406%4% 5 a day, the most in 5 years-
Network management25810%17% 9 a day, the most in 5 years22
The operators' causes
Train faults2259%16% 8 a day, more than 2 of the other 4 years1
Traincrew43917%11% 16 a day, the most in 5 years30
Stations693%3% 2 a day, the least in 5 years-
Operations1938%5% 7 a day, more than 3 of the other 4 years2
Operator, other29011%7% 10 a day, the most in 5 years1

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
TH(Senior) Conductor/Train Manager251
Q3NZ Pumps T243
TTLeaf fall Neutral185
TGDriver152
IISignalling lineside cable fault148
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.135
XPBRIDGE HIT123
OUDelays not Investigated by Network Rail96
QJSpecial working for leaf-fall track circuit operation85
TOTime lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility)76
Since 2018
CodeWhat Network Rail loggedMinutes
TGDriver5,039
MDTechnical failures below the solebar3,076
TOTime lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility)2,254
RBPassengers joining/alighting2,079
M7Door and Door system faults1,749
MSPlanned underpowered or shortformed service and or vehicle, incl. exam set swaps1,709
ICTrack circuit failure (including no fault found)1,530
TH(Senior) Conductor/Train Manager1,451
MNBrake and brake systems faults; including wheel flats where no other cause had been identified1,410
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.1,347