Warrington Central
2,521 delay minutes
The biggest share (17%) of the delay picked up at Warrington Central in the four weeks to 9 December 2023 came from traincrew problems.
73% of these minutes were knock-on from something that happened elsewhere first. 89% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 171 | 7% | 8% | 6 a day, the most in 5 years | - |
| Signals, points and power | 369 | 15% | 16% | 13 a day, the most in 5 years | 5 |
| Weather and structures | 21 | <1% | 7% | 1 a day, the least in 5 years | 2 |
| Autumn | 347 | 14% | 7% | 12 a day, the most in 5 years | - |
| External | 140 | 6% | 4% | 5 a day, the most in 5 years | - |
| Network management | 258 | 10% | 17% | 9 a day, the most in 5 years | 22 |
| The operators' causes | |||||
| Train faults | 225 | 9% | 16% | 8 a day, more than 2 of the other 4 years | 1 |
| Traincrew | 439 | 17% | 11% | 16 a day, the most in 5 years | 30 |
| Stations | 69 | 3% | 3% | 2 a day, the least in 5 years | - |
| Operations | 193 | 8% | 5% | 7 a day, more than 3 of the other 4 years | 2 |
| Operator, other | 290 | 11% | 7% | 10 a day, the most in 5 years | 1 |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TH | (Senior) Conductor/Train Manager | 251 |
| Q3 | NZ Pumps T | 243 |
| TT | Leaf fall Neutral | 185 |
| TG | Driver | 152 |
| II | Signalling lineside cable fault | 148 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 135 |
| XP | BRIDGE HIT | 123 |
| OU | Delays not Investigated by Network Rail | 96 |
| QJ | Special working for leaf-fall track circuit operation | 85 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 76 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 5,039 |
| MD | Technical failures below the solebar | 3,076 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 2,254 |
| RB | Passengers joining/alighting | 2,079 |
| M7 | Door and Door system faults | 1,749 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 1,709 |
| IC | Track circuit failure (including no fault found) | 1,530 |
| TH | (Senior) Conductor/Train Manager | 1,451 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 1,410 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 1,347 |