Leaves on the Line

Wadhurst

WAD Kent route
CSV JSON

1,159 delay minutes

The biggest share (29%) of the delay picked up at Wadhurst in the four weeks to 9 December 2023 came from autumn leaves.

42% of these minutes were knock-on from something that happened elsewhere first. 99% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track303%8% 1 a day, the most in 5 years-
Signals, points and power1069%16% 4 a day, more than 3 of the other 4 years-
Weather and structures14513%7% 5 a day, more than 3 of the other 4 years-
Autumn33829%7% 12 a day, the most in 5 years-
External282%4% 1 a day, more than 3 of the other 4 years-
Network management1049%17% 4 a day, more than 3 of the other 4 years-
The operators' causes
Train faults676%16% 2 a day, the most in 5 years-
Traincrew262%11% 1 a day, more than 1 of the other 4 years-
Stations7<1%3% 0 a day, the least in 5 years-
Operations202%5% 1 a day, more than 3 of the other 4 years-
Operator, other28925%7% 10 a day, more than 3 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
Q3NZ Pumps T228
TTLeaf fall Neutral228
OGIce on conductor rail/OHLE145
QICautioning due to railhead leaf contamination110
I1Overhead line/third rail defect48
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)43
I9Fires starting on Network Rail Infrastructure28
VHPassenger Communication cord, door egress or emergency train alarm operated28
TGDriver26
IKTelecom equipment failure (including no fault found)24
Since 2018
CodeWhat Network Rail loggedMinutes
IVCutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure)4,495
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)3,794
JPFailure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards2,094
ICTrack circuit failure (including no fault found)2,040
TTLeaf fall Neutral1,614
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.1,545
TGDriver1,480
IBPoints failure (including no fault found)1,419
I9Fires starting on Network Rail Infrastructure1,182
IRBroken/cracked/twisted/buckled/flawed rail1,115