Walton (Merseyside)
9 delay minutes
Most of the delay picked up at Walton (Merseyside) in the four weeks to 9 December 2023 came from faulty trains.
44% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | Trains cancelled |
|---|---|---|---|---|
| Network Rail's causes | ||||
| Track | - | - | 8% | - |
| Signals, points and power | - | - | 16% | - |
| Weather and structures | - | - | 7% | - |
| Autumn | - | - | 7% | - |
| External | - | - | 4% | - |
| Network management | - | - | 17% | - |
| The operators' causes | ||||
| Train faults | 9 | 100% | 16% | 2 |
| Traincrew | - | - | 11% | - |
| Stations | - | - | 3% | - |
| Operations | - | - | 5% | - |
| Operator, other | - | - | 7% | - |
Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| MD | Technical failures below the solebar | 9 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| MD | Technical failures below the solebar | 114 |
| M8 | Technical failures above the Solebar | 47 |
| I9 | Fires starting on Network Rail Infrastructure | 36 |
| IB | Points failure (including no fault found) | 24 |
| TG | Driver | 22 |
| TH | (Senior) Conductor/Train Manager | 22 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 19 |
| MU | Depot operating problem | 19 |
| I1 | Overhead line/third rail defect | 18 |
| M7 | Door and Door system faults | 17 |