London Waterloo
17,194 delay minutes
The biggest share (28%) of the delay picked up at London Waterloo in the four weeks to 9 December 2023 came from signal, points and power faults.
85% of these minutes were knock-on from something that happened elsewhere first. 99% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 1,638 | 10% | 8% | 59 a day, more than 2 of the other 4 years | 24 |
| Signals, points and power | 4,733 | 28% | 16% | 169 a day, more than 3 of the other 4 years | 35 |
| Weather and structures | 408 | 2% | 7% | 15 a day, more than 3 of the other 4 years | 51 |
| Autumn | 731 | 4% | 7% | 26 a day, more than 3 of the other 4 years | - |
| External | 87 | <1% | 4% | 3 a day, the least in 5 years | - |
| Network management | 2,898 | 17% | 17% | 104 a day, more than 1 of the other 4 years | 70 |
| The operators' causes | |||||
| Train faults | 2,220 | 13% | 16% | 79 a day, more than 2 of the other 4 years | 74 |
| Traincrew | 2,428 | 14% | 11% | 87 a day, more than 3 of the other 4 years | 211 |
| Stations | 580 | 3% | 3% | 21 a day, more than 2 of the other 4 years | 1 |
| Operations | 535 | 3% | 5% | 19 a day, the most in 5 years | 50 |
| Operator, other | 936 | 5% | 7% | 33 a day, more than 2 of the other 4 years | 10 |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IB | Points failure (including no fault found) | 2,710 |
| TG | Driver | 1,491 |
| IC | Track circuit failure (including no fault found) | 1,079 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 991 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 838 |
| I5 | Possession over-run from planned work | 832 |
| TI | Traincrew rostering problem | 646 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 637 |
| MD | Technical failures below the solebar | 537 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 510 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 51,616 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 44,448 |
| IC | Track circuit failure (including no fault found) | 43,286 |
| MD | Technical failures below the solebar | 38,209 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 35,037 |
| IB | Points failure (including no fault found) | 33,136 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 30,996 |
| TH | (Senior) Conductor/Train Manager | 25,991 |
| M7 | Door and Door system faults | 22,519 |
| I5 | Possession over-run from planned work | 20,568 |