Warrington Bank Quay
2,114 delay minutes
The biggest share (28%) of the delay picked up at Warrington Bank Quay in the four weeks to 9 December 2023 came from weather and structures.
47% of these minutes were knock-on from something that happened elsewhere first. 96% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 67 | 3% | 8% | 2 a day, more than 3 of the other 4 years | 2 |
| Signals, points and power | 264 | 12% | 16% | 9 a day, more than 2 of the other 4 years | 1 |
| Weather and structures | 593 | 28% | 7% | 21 a day, the most in 5 years | 3 |
| Autumn | 34 | 2% | 7% | 1 a day, the least in 5 years | 1 |
| External | 90 | 4% | 4% | 3 a day, more than 3 of the other 4 years | - |
| Network management | 431 | 20% | 17% | 15 a day, the most in 5 years | - |
| The operators' causes | |||||
| Train faults | 150 | 7% | 16% | 5 a day, the least in 5 years | 1 |
| Traincrew | 222 | 11% | 11% | 8 a day, more than 3 of the other 4 years | 3 |
| Stations | 81 | 4% | 3% | 3 a day, more than 1 of the other 4 years | - |
| Operations | 141 | 7% | 5% | 5 a day, more than 1 of the other 4 years | - |
| Operator, other | 41 | 2% | 7% | 1 a day, the least in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| JD | Structures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes) | 318 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 269 |
| TG | Driver | 123 |
| IB | Points failure (including no fault found) | 108 |
| JX | Miscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains) | 93 |
| TH | (Senior) Conductor/Train Manager | 86 |
| J4 | Infrastructure Safety Issue Reported by Member of the Public - No Fault Found | 82 |
| TZ | Other Passenger Train Operating Company causes | 77 |
| OU | Delays not Investigated by Network Rail | 75 |
| XO | External trees, building or structures encroaching or falling onto network infrastructure (not weather or vandalism) | 60 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| T2 | Delay at unstaffed station to non-DOO train | 4,020 |
| TG | Driver | 3,923 |
| MD | Technical failures below the solebar | 2,461 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 2,299 |
| TH | (Senior) Conductor/Train Manager | 1,955 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 1,917 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 1,899 |
| IB | Points failure (including no fault found) | 1,831 |
| IC | Track circuit failure (including no fault found) | 1,662 |
| M8 | Technical failures above the Solebar | 1,645 |