Leaves on the Line

Warrington Bank Quay

WBQ North West route
CSV JSON

2,114 delay minutes

The biggest share (28%) of the delay picked up at Warrington Bank Quay in the four weeks to 9 December 2023 came from weather and structures.

47% of these minutes were knock-on from something that happened elsewhere first. 96% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track673%8% 2 a day, more than 3 of the other 4 years2
Signals, points and power26412%16% 9 a day, more than 2 of the other 4 years1
Weather and structures59328%7% 21 a day, the most in 5 years3
Autumn342%7% 1 a day, the least in 5 years1
External904%4% 3 a day, more than 3 of the other 4 years-
Network management43120%17% 15 a day, the most in 5 years-
The operators' causes
Train faults1507%16% 5 a day, the least in 5 years1
Traincrew22211%11% 8 a day, more than 3 of the other 4 years3
Stations814%3% 3 a day, more than 1 of the other 4 years-
Operations1417%5% 5 a day, more than 1 of the other 4 years-
Operator, other412%7% 1 a day, the least in 5 years-

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
JDStructures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes)318
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail269
TGDriver123
IBPoints failure (including no fault found)108
JXMiscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains)93
TH(Senior) Conductor/Train Manager86
J4Infrastructure Safety Issue Reported by Member of the Public - No Fault Found82
TZOther Passenger Train Operating Company causes77
OUDelays not Investigated by Network Rail75
XOExternal trees, building or structures encroaching or falling onto network infrastructure (not weather or vandalism)60
Since 2018
CodeWhat Network Rail loggedMinutes
T2Delay at unstaffed station to non-DOO train4,020
TGDriver3,923
MDTechnical failures below the solebar2,461
IRBroken/cracked/twisted/buckled/flawed rail2,299
TH(Senior) Conductor/Train Manager1,955
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure1,917
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)1,899
IBPoints failure (including no fault found)1,831
ICTrack circuit failure (including no fault found)1,662
M8Technical failures above the Solebar1,645