Leaves on the Line

West Byfleet

WBY Wessex route
CSV JSON

0 delay minutes

No delay was picked up at West Byfleet in the four weeks to 9 December 2023.

100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideTrains cancelled
Network Rail's causes
Track--8%-
Signals, points and power--16%-
Weather and structures--7%-
Autumn--7%-
External--4%-
Network management--17%-
The operators' causes
Train faults--16%-
Traincrew--11%-
Stations--3%-
Operations--5%-
Operator, other--7%-

Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.

Period by period

Delay minutes a day, period by period. Gridlines every 1 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
Nothing logged.
Since 2018
CodeWhat Network Rail loggedMinutes
I5Possession over-run from planned work38
JLSafety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff)27
MSPlanned underpowered or shortformed service and or vehicle, incl. exam set swaps17
OQIncorrect simplifier13
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.11
M7Door and Door system faults9
ICTrack circuit failure (including no fault found)5
IVCutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure)5
TH(Senior) Conductor/Train Manager3
XPBRIDGE HIT3