Westcliff
23 delay minutes
Most of the delay picked up at Westcliff in the four weeks to 9 December 2023 came from how the network was run.
57% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | Trains cancelled |
|---|---|---|---|---|
| Network Rail's causes | ||||
| Track | - | - | 8% | - |
| Signals, points and power | - | - | 16% | - |
| Weather and structures | - | - | 7% | - |
| Autumn | - | - | 7% | - |
| External | - | - | 4% | - |
| Network management | 13 | 54% | 17% | - |
| The operators' causes | ||||
| Train faults | - | - | 16% | - |
| Traincrew | 4 | 17% | 11% | - |
| Stations | 1 | 4% | 3% | - |
| Operations | 2 | 7% | 5% | - |
| Operator, other | 4 | 17% | 7% | - |
Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| OD | Delays due to National/Regional/Route Operations directives or Route Control decision or directive | 6 |
| TW | Driver adhering to company professional driving standards or policy | 4 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 4 |
| JX | Miscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains) | 3 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 2 |
| Q1 | Takeback Pumps | 2 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 2 |
| RB | Passengers joining/alighting | 1 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 247 |
| I2 | AC/DC trip (including no fault or cause found) | 192 |
| TG | Driver | 185 |
| TW | Driver adhering to company professional driving standards or policy | 156 |
| IH | Power Supply And Distribution System Failure | 147 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 145 |
| XK | National Grid Power Failure - local area also affected (inc outage, surges, blips where working standby generator/UPS installed) | 133 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 122 |
| IB | Points failure (including no fault found) | 117 |
| MD | Technical failures below the solebar | 101 |