Leaves on the Line

Worcester Park

WCP Wessex route
CSV JSON

0 delay minutes

No delay was picked up at Worcester Park in the four weeks to 9 December 2023.

100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideTrains cancelled
Network Rail's causes
Track--8%-
Signals, points and power--16%-
Weather and structures--7%-
Autumn--7%-
External--4%-
Network management--17%-
The operators' causes
Train faults--16%1
Traincrew--11%-
Stations--3%-
Operations--5%-
Operator, other--7%-

Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.

Period by period

Delay minutes a day, period by period. Gridlines every 1 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
Nothing logged.
Since 2018
CodeWhat Network Rail loggedMinutes
TGDriver174
IBPoints failure (including no fault found)93
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)26
OCSignaller including mis-routing (not ERTM /ETCS related)25
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail23
T2Delay at unstaffed station to non-DOO train20
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure20
VBVandalism or theft16
TH(Senior) Conductor/Train Manager9
M7Door and Door system faults7