Wembley Stadium
0 delay minutes
No delay was picked up at Wembley Stadium in the four weeks to 9 December 2023.
100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | Trains cancelled |
|---|---|---|---|---|
| Network Rail's causes | ||||
| Track | - | - | 8% | - |
| Signals, points and power | - | - | 16% | - |
| Weather and structures | - | - | 7% | - |
| Autumn | - | - | 7% | - |
| External | - | - | 4% | - |
| Network management | - | - | 17% | - |
| The operators' causes | ||||
| Train faults | - | - | 16% | - |
| Traincrew | - | - | 11% | - |
| Stations | - | - | 3% | - |
| Operations | - | - | 5% | - |
| Operator, other | - | - | 7% | - |
Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| Nothing logged. | ||
| Code | What Network Rail logged | Minutes |
|---|---|---|
| R7 | Station delays as a result of overcrowding due to planned events (e.g. sports fixtures, concerts) | 115 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 107 |
| M8 | Technical failures above the Solebar | 82 |
| TG | Driver | 64 |
| MD | Technical failures below the solebar | 57 |
| IC | Track circuit failure (including no fault found) | 57 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 48 |
| TZ | Other Passenger Train Operating Company causes | 28 |
| MU | Depot operating problem | 26 |
| XI | Security alert affecting the Network Rail network (incl. line blocks for emergency services attending off network incidents) | 25 |