Leaves on the Line

Windermere

WDM North West route
CSV JSON

528 delay minutes

The biggest share (18%) of the delay picked up at Windermere in the four weeks to 9 December 2023 came from faulty trains.

91% of these minutes were knock-on from something that happened elsewhere first. 65% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track--8% 0 a day, the least in 5 years-
Signals, points and power448%16% 2 a day, the most in 5 years-
Weather and structures6412%7% 2 a day, more than 3 of the other 4 years14
Autumn295%7% 1 a day, the most in 5 years-
External--4% 0 a day, the least in 5 years1
Network management346%17% 1 a day, more than 3 of the other 4 years5
The operators' causes
Train faults9418%16% 3 a day, more than 2 of the other 4 years3
Traincrew9117%11% 3 a day, more than 3 of the other 4 years12
Stations6011%3% 2 a day, the most in 5 years-
Operations6713%5% 2 a day, more than 3 of the other 4 years-
Operator, other469%7% 2 a day, more than 3 of the other 4 years3

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
TH(Senior) Conductor/Train Manager76
XTSevere snow or ice affecting infrastructure which is the responsibility of NR (including implementation of Key Route Strategy)61
TZOther Passenger Train Operating Company causes37
MPRail / wheel interface, adhesion problems (including ice on the running rail)31
Q3NZ Pumps T29
RBPassengers joining/alighting29
Q1Takeback Pumps24
DDTechnical Fleet Holding Code21
RAStation Buildings and Facilities (incl Platforms)19
IBPoints failure (including no fault found)18
Since 2018
CodeWhat Network Rail loggedMinutes
TGDriver2,117
MDTechnical failures below the solebar1,102
TH(Senior) Conductor/Train Manager803
M8Technical failures above the Solebar532
X2Severe flooding beyond that which could be mitigated on Network Rail infrastructure451
TOTime lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility)417
M7Door and Door system faults414
TZOther Passenger Train Operating Company causes379
RBPassengers joining/alighting362
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail355