Leaves on the Line

West Drayton

WDT Western route
CSV JSON

22 delay minutes

Most of the delay picked up at West Drayton in the four weeks to 9 December 2023 came from faulty trains.

41% of these minutes were knock-on from something that happened elsewhere first. 41% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideTrains cancelled
Network Rail's causes
Track--8%1
Signals, points and power941%16%-
Weather and structures--7%-
Autumn--7%-
External--4%-
Network management--17%2
The operators' causes
Train faults1359%16%2
Traincrew--11%-
Stations--3%-
Operations--5%1
Operator, other--7%-

Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.

Period by period

Delay minutes a day, period by period. Gridlines every 1 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
M2Delay due to ATO / ETCS equipment13
IBPoints failure (including no fault found)9
Since 2018
CodeWhat Network Rail loggedMinutes
I1Overhead line/third rail defect119
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail28
XPBRIDGE HIT24
TXDelays incurred on non-Network Rail running lines or networks including London Underground (except fleet related delays)22
M2Delay due to ATO / ETCS equipment16
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.13
OLSignal Box not open during booked hours13
IBPoints failure (including no fault found)12
MNBrake and brake systems faults; including wheel flats where no other cause had been identified11
JLSafety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff)6