1,704 delay minutes

The biggest share (40%) of the delay picked up at Wellingborough in the four weeks to 9 December 2023 came from how the network was run.

85% of these minutes were knock-on from something that happened elsewhere first. 90% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track18911%8% 7 a day, more than 3 of the other 4 years-
Signals, points and power22813%16% 8 a day, the most in 5 years-
Weather and structures1026%7% 4 a day, more than 3 of the other 4 years-
Autumn443%7% 2 a day, the most in 5 years-
External--4% 0 a day, the least in 5 years-
Network management68940%17% 25 a day, more than 3 of the other 4 years1
The operators' causes
Train faults17410%16% 6 a day, more than 3 of the other 4 years2
Traincrew1469%11% 5 a day, more than 3 of the other 4 years2
Stations604%3% 2 a day, more than 3 of the other 4 years-
Operations191%5% 1 a day, more than 1 of the other 4 years-
Operator, other543%7% 2 a day, more than 2 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 50 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)234
ZUNo Cause Identified After investigation by both Parties130
TGDriver108
JBReactionary Delay to 'P' coded TSRs84
OCSignaller including mis-routing (not ERTM /ETCS related)82
I5Possession over-run from planned work72
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.70
J3Axle Counter Failure54
M8Technical failures above the Solebar49
ICTrack circuit failure (including no fault found)39
Since 2018
CodeWhat Network Rail loggedMinutes
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)5,967
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.4,685
TGDriver2,809
ZUNo Cause Identified After investigation by both Parties2,807
JBReactionary Delay to 'P' coded TSRs2,643
M8Technical failures above the Solebar2,304
OCSignaller including mis-routing (not ERTM /ETCS related)2,080
MDTechnical failures below the solebar1,829
ICTrack circuit failure (including no fault found)1,429
M7Door and Door system faults1,344