Wellingborough
1,704 delay minutes
The biggest share (40%) of the delay picked up at Wellingborough in the four weeks to 9 December 2023 came from how the network was run.
85% of these minutes were knock-on from something that happened elsewhere first. 90% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 189 | 11% | 8% | 7 a day, more than 3 of the other 4 years | - |
| Signals, points and power | 228 | 13% | 16% | 8 a day, the most in 5 years | - |
| Weather and structures | 102 | 6% | 7% | 4 a day, more than 3 of the other 4 years | - |
| Autumn | 44 | 3% | 7% | 2 a day, the most in 5 years | - |
| External | - | - | 4% | 0 a day, the least in 5 years | - |
| Network management | 689 | 40% | 17% | 25 a day, more than 3 of the other 4 years | 1 |
| The operators' causes | |||||
| Train faults | 174 | 10% | 16% | 6 a day, more than 3 of the other 4 years | 2 |
| Traincrew | 146 | 9% | 11% | 5 a day, more than 3 of the other 4 years | 2 |
| Stations | 60 | 4% | 3% | 2 a day, more than 3 of the other 4 years | - |
| Operations | 19 | 1% | 5% | 1 a day, more than 1 of the other 4 years | - |
| Operator, other | 54 | 3% | 7% | 2 a day, more than 2 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 234 |
| ZU | No Cause Identified After investigation by both Parties | 130 |
| TG | Driver | 108 |
| JB | Reactionary Delay to 'P' coded TSRs | 84 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 82 |
| I5 | Possession over-run from planned work | 72 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 70 |
| J3 | Axle Counter Failure | 54 |
| M8 | Technical failures above the Solebar | 49 |
| IC | Track circuit failure (including no fault found) | 39 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 5,967 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 4,685 |
| TG | Driver | 2,809 |
| ZU | No Cause Identified After investigation by both Parties | 2,807 |
| JB | Reactionary Delay to 'P' coded TSRs | 2,643 |
| M8 | Technical failures above the Solebar | 2,304 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 2,080 |
| MD | Technical failures below the solebar | 1,829 |
| IC | Track circuit failure (including no fault found) | 1,429 |
| M7 | Door and Door system faults | 1,344 |